| 2025 | WSC | Modeling and Solving Complex Job-Shop Scheduling Problems for Reliability Laboratories. | Jessica Hautz, Andreas Klemmt, Lars Mnch |
| 2024 | WSC | Scheduling Jobs on a Single Stress Test Machine in a Reliability Laboratory. | Jessica Hautz, Andreas Klemmt, Lars Mnch |
| 2017 | WSC | From dispatching to scheduling: Challenges in integrating a generic optimization platform into semiconductor shop floor execution. | Andreas Klemmt, Jens Kutschke, Christian Schubert |
| 2016 | WSC | A CP approach for planning lot release dates in a supply chain of semiconductor manufacturing. | Dirk Doleschal, Gottfried Nieke, Gerald Weigert, Andreas Klemmt |
| 2015 | WSC | Yield integrated scheduling using machine condition parameter. | Dirk Doleschal, Gerald Weigert, Andreas Klemmt |
| 2014 | WSC | Scheduling preventive maintenance tasks with synchronization constraints for human resources by a CP modeling approach. | Jan Lange, Dirk Doleschal, Gerald Weigert, Andreas Klemmt |
| 2013 | WSC | Advanced secondary resource control in semiconductor lithography areas: From theory to practice. | Dirk Doleschal, Gerald Weigert, Andreas Klemmt, Frank Lehmann |
| 2013 | WSC | Scheduling maintenance tasks with time-dependent synchronization constraints by a CP modeling approach. | Jan Lange, Gerald Weigert, Andreas Klemmt, Peter Doherr |
| 2012 | WSC | Improving flow line scheduling by upstream mixed integer resource allocation in a wafer test facility. | Dirk Doleschal, Jan Lange, Gerald Weigert, Andreas Klemmt |
| 2012 | WSC | Scheduling jobs with time constraints between consecutive process steps in semiconductor manufacturing. | Andreas Klemmt, Lars Mnch |
| 2012 | WSC | Product mix optimization for a semiconductor fab: modeling approaches and decomposition techniques. | Andreas Klemmt, Martin Romauch, Walter Laure |
| 2012 | WSC | One solver for all - a generic allocation concept for planning and shop floor control. | Sebastian Werner, Frank Lehmann, Andreas Klemmt, Joerg Domaschke |
| 2011 | WSC | An optimization approach for parallel machine problems with dedication constraints: combining simulation and capacity planning. | Andreas Klemmt, Gerald Weigert |
| 2010 | WSC | A multistage mathematical programming based scheduling approach for the photolithography area in semiconductor manufacturing. | Andreas Klemmt, Jan Lange, Gerald Weigert, Frank Lehmann, Jens Seyfert |
| 2009 | WSC | A Comparison of MIP-based Decomposition Techniques and VNS Approaches for Batch Scheduling Problems. | Andreas Klemmt, Gerald Weigert, Christian Almeder, Lars Mnch |
| 2008 | WSC | Simulations-based and solver-based optimization approaches for batch processes in semiconductor manufacturing. | Andreas Klemmt, Sven Horn, Gerald Weigert, Thomas Hielscher |