| 2018 | WSC | Bridging the Gap between fab simulation and supply Chain Forecast. | Wolfgang Scholl, Matthias Forster, Patrick Preuss, Andr Naumann, Hui Ping Ooi, Boon-Ping Gan |
| 2018 | WSC | Operator Resource modelling in a Multiple wafer Sizes fabrication Environment using discrete Event simulation. | Georg Seidel, Patrick Preuss, Andr Naumann, Soo Leen Low, Chew Wye Chan, Boon-Ping Gan |
| 2017 | WSC | An easy approach to extending a short term simulation model for long term forecast in semiconductor industry. | Marcin Mosinski, Tobias Weissgaerber, Soo Leen Low, Boon-Ping Gan, Patrick Preuss |
| 2017 | WSC | Harmonizing operations management of key stakeholders in wafer fab using discrete event simulation. | Georg Seidel, Ching Foong Lee, Ai Mei Kam, Boon-Ping Gan, Chew Wye Chan, Andr Naumann, Patrick Preuss |
| 2016 | WSC | Simulation-enabled development lot journey smoothening in a fully-utilised semiconductor manufacturing line. | Wolfgang Scholl, Matthias Forster, Patrick Preuss, Andr Naumann, Boon-Ping Gan, Peter Lendermann |
| 2014 | WSC | Enhancement of simulation-based semiconductor manufacturing forecast quality through hybrid tool down time modeling. | Patrick Preuss, Andr Naumann, Wolfgang Scholl, Boon-Ping Gan, Peter Lendermann |
| 2013 | WSC | Automatic model verification for semiconductor manufacturing simulation. | Boon-Ping Gan, Peter Lendermann, Wolfgang Scholl, Marcin Mosinski, Patrick Preuss |
| 2012 | WSC | A multi-stage discrete event simulation approach for scheduling of maintenance activities in a semiconductor manufacturing line. | Wolfgang Scholl, Marcin Mosinski, Boon-Ping Gan, Peter Lendermann, Patrick Preuss, Daniel Noack |
| 2011 | WSC | Symbiotic simulation for optimisation of tool operations in semiconductor manufacturing. | Heiko Aydt, Stephen John Turner, Wentong Cai, Boon-Ping Gan |
| 2011 | WSC | Challenges and solution approaches for the online simulation of semiconductor wafer fabs. | Daniel Noack, Marcin Mosinski, Oliver Rose, Peter Lendermann, Boon-Ping Gan, Wolfgang Scholl |
| 2011 | WSC | Implementation of a simulation-based short-term lot arrival forecast in a mature 200mm semiconductor fab. | Wolfgang Scholl, Daniel Noack, Oliver Rose, Boon-Ping Gan, Peter Lendermann, Patrick Preuss, Falk Stefan Pappert |
| 2010 | WSC | Unlocking value from component exchange contracts in aviation using simulation-based optimisation. | Peter Lendermann, Boon-Ping Gan, Nirupam Julka, Arnd Schirrmann, Gan Helge Fromm |
| 2010 | WSC | Towards realization of a high-fidelity simulation model for short-term horizon forecasting in wafer fabrication facilities. | Wolfgang Scholl, Boon-Ping Gan, Ming Li Peh, Peter Lendermann, Daniel Noack, Oliver Rose, Patrick Preuss |
| 2008 | ICCS | Symbiotic Simulation Control in Semiconductor Manufacturing. | Heiko Aydt, Stephen John Turner, Wentong Cai, Malcolm Yoke Hean Low, Peter Lendermann, Boon-Ping Gan |
| 2008 | WSC | Preventive what-if analysis in symbiotic simulation. | Heiko Aydt, Stephen John Turner, Wentong Cai, Malcolm Yoke Hean Low, Peter Lendermann, Boon-Ping Gan, Rassul Ayani |
| 2008 | WSC | Predictive-conservative synchronization for commercial simulation package interoperability. | Yuanxi Liang, Stephen John Turner, Boon-Ping Gan |
| 2008 | WSC | An optimization framework for waferfab performance enhancement. | Daniel Noack, Boon-Ping Gan, Peter Lendermann, Oliver Rose |
| 2006 | WSC | Interoperating simulations of automatic material handling systems and manufacturing processes. | Boon-Ping Gan, Lai Peng Chan, Stephen John Turner |
| 2006 | WSC | Simulation analysis on the impact of furnace batch size increase in a deposition loop. | Boon-Ping Gan, Peter Lendermann, Kelvin Paht Te Quek, Bart van der Heijden, Chen Chong Chin, Choon Yap Koh |
| 2005 | WSC | Interoperating autosched AP using the high level architecture. | Boon-Ping Gan, Peter Lendermann, Malcolm Yoke Hean Low, Stephen John Turner, Xiaoguang Wang, Simon J. E. Taylor |
| 2005 | WSC | An integrated and adaptive decision-support framework for high-tech manufacturing and service networks. | Peter Lendermann, Malcolm Y. H. Low, Boon-Ping Gan, Nirupam Julka, Lai Peng Chan, Loo Hay Lee, Simon J. E. Taylor, Stephen John Turner, Wentong Cai, Xiaoguang Wang, Terence Hung, Leon F. McGinnis, Stephen J. Buckley |
| 2005 | WSC | A COTS Simulation Package Emulator (CSPE) for investigating COTS simulation package interoperability. | Xiaoguang Wang, Stephen John Turner, Simon J. E. Taylor, Malcolm Y. H. Low, Boon-Ping Gan |
| 2004 | PADS | Optimistic Synchronization in HLA Based Distributed Simulation. | Xiaoguang Wang, Stephen John Turner, Yoke-Hean Low, Boon-Ping Gan |
| 2004 | WSC | Incremental HLA-Based Distributed Simulation Cloning. | Dan Chen, Stephen John Turner, Wentong Cai, Boon-Ping Gan, Malcolm Yoke Hean Low |
| 2004 | WSC | Analysis of a Customer Demand Driven Semiconductor Supply Chain in a Distributed Simulation Test Bed. | Chin Soon Chong, Peter Lendermann, Boon-Ping Gan, Brett Marc Duarte, John W. Fowler, Thomas E. Callarman |
| 2004 | WSC | Analysis of a Borderless Fab Scenario in a Distributed Simulation Testbed. | Peter Lendermann, Boon-Ping Gan, Yoon Loong Loh, Hiap Keong Tan, Sip Khean Lieu, John W. Fowler, Leon F. McGinnis |
| 2003 | WSC | Distributed simulation and manufacturing: synchronization and management of shared state in HLA-based distributed simulation. | Boon-Ping Gan, Malcolm Yoke Hean Low, Junhu Wei, Xiaoguang Wang, Stephen John Turner, Wentong Cai |
| 2003 | WSC | The process of process reengineering: integration of discrete event simulation models with framework-based business applications. | Peter Lendermann, Nirupam Julka, Lai Peng Chan, Boon-Ping Gan |
| 2003 | WSC | Commercial-off-the-shelf distributed simulation, panel: HLA-CSPIF panel on commercial off-the-shelf distributed simulation. | Simon J. E. Taylor, Steffen Straburger, Boon-Ping Gan, Alexander Verbraeck |
| 2002 | WSC | Panel discussion on distributed simulation and industry: potentials and pitfalls: distributed simulation and industry: potentials and pitfalls. | Agostino G. Bruzzone, Simon J. E. Taylor, Richard M. Fujimoto, Boon-Ping Gan, Steffen Straburger, Ray J. Paul |
| 2001 | PADS | Hierarchical federations: an architecture for information hiding. | Wentong Cai, Stephen John Turner, Boon-Ping Gan |
| 2001 | WSC | Managing event traces for a web front-end to a parallel simulation. | Boon-Ping Gan, Li Liu, Zhengrong Ji, Stephen John Turner, Wentong Cai |
| 2001 | WSC | Distributed simulation with incorporated APS procedures for high-fidelity supply chain optimization. | Peter Lendermann, Boon-Ping Gan, Leon F. McGinnis |
| 2000 | EuroPar | Implementation Lessons of Performance Prediction Tool for Parallel Conservative Simulation (Research Note). | Chu-Cheow Lim, Yoke-Hean Low, Boon-Ping Gan, Wentong Cai |
| 2000 | PADS | Load balancing for conservative simulation on shared memory multiprocessor systems. | Boon-Ping Gan, Yoke-Hean Low, Sanjay Jain, Stephen John Turner, Wentong Cai, Wen-Jing Hsu, Shell-Ying Huang |
| 2000 | WSC | Manufacturing sypply chain management: distributed supply chain simulation across enterprise boundaries. | Boon-Ping Gan, Li Liu, Sanjay Jain, Stephen John Turner, Wentong Cai, Wen-Jing Hsu |
| 1999 | PADS | Performance Prediction Tools for Parallel Discrete-Event Simulation. | Chu-Cheow Lim, Yoke-Hean Low, Boon-Ping Gan, Sanjay Jain, Wentong Cai, Wen-Jing Hsu, Shell-Ying Huang |
| 1999 | PDPTA | Computing Safetime in a Conservative Synchronous Simulation Based on Future Events. | Chu-Cheow Lim, Boon-Ping Gan, Yoke-Hean Low |
| 1999 | WSC | Criticality of detailed modeling in semiconductor supply chain simulation. | Sanjay Jain, Chu-Cheow Lim, Boon-Ping Gan, Yoke-Hean Low |
| 1998 | HiPC | A conservative parallel simulation algorithm for entity-oriented modeling. | Chu-Cheow Lim, Yoke-Hean Low, Boon-Ping Gan |
| 1998 | WSC | Implementations of Dispatch Rules in Parallel Manufacturing Simulation. | Chu-Cheow Lim, Yoke-Hean Low, Boon-Ping Gan, Sanjay Jain |