| 2012 | WSC | A multi-stage discrete event simulation approach for scheduling of maintenance activities in a semiconductor manufacturing line. | Wolfgang Scholl, Marcin Mosinski, Boon-Ping Gan, Peter Lendermann, Patrick Preuss, Daniel Noack |
| 2011 | WSC | Cluster based analytical method for the lot delivery forecast in semiconductor fab with wide product range. | Marcin Mosinski, Daniel Noack, Falk Stefan Pappert, Oliver Rose, Wolfgang Scholl |
| 2011 | WSC | Challenges and solution approaches for the online simulation of semiconductor wafer fabs. | Daniel Noack, Marcin Mosinski, Oliver Rose, Peter Lendermann, Boon-Ping Gan, Wolfgang Scholl |
| 2011 | WSC | Implementation of a simulation-based short-term lot arrival forecast in a mature 200mm semiconductor fab. | Wolfgang Scholl, Daniel Noack, Oliver Rose, Boon-Ping Gan, Peter Lendermann, Patrick Preuss, Falk Stefan Pappert |
| 2010 | WSC | Towards realization of a high-fidelity simulation model for short-term horizon forecasting in wafer fabrication facilities. | Wolfgang Scholl, Boon-Ping Gan, Ming Li Peh, Peter Lendermann, Daniel Noack, Oliver Rose, Patrick Preuss |
| 2009 | WSC | Evaluation of Modeling, Simulation and Optimization Approaches for Work Flow Management in Semiconductor Manufacturing. | Robert Kohn, Daniel Noack, Marcin Mosinski, Zhugen Zhou, Oliver Rose |
| 2008 | WSC | An optimization framework for waferfab performance enhancement. | Daniel Noack, Boon-Ping Gan, Peter Lendermann, Oliver Rose |
| 2008 | WSC | A simulation based optimization algorithm for slack reduction and workforce scheduling. | Daniel Noack, Oliver Rose |