| 2017 | WSC | Robustness analysis of an MIP for production areas with time constraints and tool interruptions in semiconductor manufacturing. | Christian Maleck, Gerald Weigert, Detlef Pabst, Marcel Stehli |
| 2016 | WSC | A CP approach for planning lot release dates in a supply chain of semiconductor manufacturing. | Dirk Doleschal, Gottfried Nieke, Gerald Weigert, Andreas Klemmt |
| 2015 | WSC | Yield integrated scheduling using machine condition parameter. | Dirk Doleschal, Gerald Weigert, Andreas Klemmt |
| 2014 | WSC | Scheduling preventive maintenance tasks with synchronization constraints for human resources by a CP modeling approach. | Jan Lange, Dirk Doleschal, Gerald Weigert, Andreas Klemmt |
| 2014 | WSC | Evaluations on scheduling in semiconductor manufacturing by backward simulation. | Wolfgang Scholl, Christoph Laroque, Gerald Weigert |
| 2013 | WSC | Advanced secondary resource control in semiconductor lithography areas: From theory to practice. | Dirk Doleschal, Gerald Weigert, Andreas Klemmt, Frank Lehmann |
| 2013 | WSC | Scheduling maintenance tasks with time-dependent synchronization constraints by a CP modeling approach. | Jan Lange, Gerald Weigert, Andreas Klemmt, Peter Doherr |
| 2012 | WSC | Improving flow line scheduling by upstream mixed integer resource allocation in a wafer test facility. | Dirk Doleschal, Jan Lange, Gerald Weigert, Andreas Klemmt |
| 2012 | WSC | Introducing the virtual time based flow principle in a high-mix low-volume wafer test facility and exploring the behavior of its key performance indicators. | Jan Lange, Gerald Weigert, Sophia Keil, Rainer Lasch, Dietrich Eberts |
| 2011 | WSC | An optimization approach for parallel machine problems with dedication constraints: combining simulation and capacity planning. | Andreas Klemmt, Gerald Weigert |
| 2010 | WSC | A multistage mathematical programming based scheduling approach for the photolithography area in semiconductor manufacturing. | Andreas Klemmt, Jan Lange, Gerald Weigert, Frank Lehmann, Jens Seyfert |
| 2009 | WSC | A Comparison of MIP-based Decomposition Techniques and VNS Approaches for Batch Scheduling Problems. | Andreas Klemmt, Gerald Weigert, Christian Almeder, Lars Mnch |
| 2008 | WSC | Simulations-based and solver-based optimization approaches for batch processes in semiconductor manufacturing. | Andreas Klemmt, Sven Horn, Gerald Weigert, Thomas Hielscher |
| 2006 | WSC | Simulation based scheduling system in a semiconductor backend facility. | Sebastian Werner, Sven Horn, Gerald Weigert, Thomas Jhnig |
| 2002 | WSC | Scheduling & control: process accompanying simulation: a general approach for the continuous optimization of manufacturing schedules in electronics production. | Sebastian Werner, Gerald Weigert |