Skip to content

Jos Elias Claudio Arroyo

Publication record assembled from the DBLP archive of ranked conferences.

Papers indexed

27

Venues

8

Active years

2008–2026

Best venue rank

C

Where they publish

Papers

27 indexed papers, newest first.

YearVenueTitleAuthors
2026GECCOMetaheuristics For The Mixed No-idle Flowshop Scheduling Problem With Due Windows.Luan Millard Correa Brasil, Jos Elias Claudio Arroyo, Tarcsio Barroso Marques
2026GECCOGRASP-RVND Metaheuristic for Traveling Salesman Problem with Drone Launch Station Location.Tarcsio Barroso Marques, Jos Elias Claudio Arroyo
2025GECCOGRASP Metaheuristic for Energy-efficient Drone Coverage Path Planning.Brbara Cristina F. de Souza, Tarcsio Barroso Marques, Jos Elias Claudio Arroyo
2023HISA Reinforcement Learning Method for Integrated Production Scheduling and Distribution.Matheus de Freitas Araujo, Thiago Henrique Nogueira, Jos Elias Claudio Arroyo, Jlio Csar Alves
2023HISA GRASP Heuristic for the Open Sub-route Traveling Salesman Problem.Paulo Henrique S. Dezingrini, Jos Elias Claudio Arroyo, Matheus de Freitas Araujo
2022ISDAHeuristics Assisted by Machine Learning for the Integrated Production Planning and Distribution Problem.Matheus de Freitas Araujo, Jos Elias Claudio Arroyo, Thiago Henrique Nogueira
2020ISDAA Hybrid Heuristic for a Three-Stage Assembly Flow Shop Scheduling Problem with Sequence Dependent Setup Time.Saulo Cunha Campos, Jos Elias Claudio Arroyo, Matheus de Freitas Araujo
2015CLEIAn application of ILS heuristic to Periodic Vehicle Routing Problem with heterogeneous fleet and fixed costs.Robert Cristian Abreu, Jos Elias Claudio Arroyo
2014GECCONSGA-II with iterated greedy for a bi-objective three-stage assembly flowshop scheduling problem.Saulo Cunha Campos, Jos Elias Claudio Arroyo
2014HISA hybrid multi-objective iterated local search heuristic for vehicle routing problem with time windows.Rafael de Freitas Aquino, Jos Elias Claudio Arroyo
2013CLEILocal search heuristics for the Flowshop Sequence Dependent Group Scheduling problem.Nilson Felipe Matos Mendes, Jos Elias Claudio Arroyo, Harlem Mauricio Madrid Villadiego
2012CECHybrid metaheuristic for the single vehicle routing problem with deliveries and selective pickups.Bruno Petrato Bruck, Andr Gustavo dos Santos, Jos Elias Claudio Arroyo
2012CLEIGenetic algorithm based approach for cluster formation in wireless sensor networks.Breno Alves Beirigo, Victor de Oliveira Matos, Jos Elias Claudio Arroyo, Luciana Brugiolo Gonalves
2012CLEIMulti-objective algorithms for the single machine scheduling problems with setup time dependent on the sequence and the job family.Marcelo Ferreira Rego, Marcone Jamilson Freitas Souza, Jos Elias Claudio Arroyo
2012HISAn efficient ILS heuristic for total flow time minimization in a Flow Shop Sequence Dependent Group Scheduling problem.Harlem Mauricio Madrid Villadiego, Jos Elias Claudio Arroyo, Vincius Vilar Jacob, Andr Gustavo dos Santos, Luciana Brugiolo Gonalves
2012ISDAMetaheuristics for the single vehicle routing problem with deliveries and selective pickups.Bruno Petrato Bruck, Andr Gustavo dos Santos, Jos Elias Claudio Arroyo
2012ISDAA two phase hybrid method to support 2D and 3D vehicle loading.Oberlan Christo Romo, Andr Gustavo dos Santos, Jos Elias Claudio Arroyo
2012SMCAn evolutionary algorithm with path-relinking for the parallel machine with job splitting.Paulo L. de Oliveira Junior, Jos Elias Claudio Arroyo, Andr Gustavo dos Santos, Luciana Brugiolo Gonalves, Alcione P. Oliveira
2012WiMobA GRASP based algorithm for efficient cluster formation in wireless sensor networks.Victor de Oliveira Matos, Jos Elias Claudio Arroyo, Andr Gustavo dos Santos, Luciana Brugiolo Gonalves
2011EMOA Bi-objective Iterated Local Search Heuristic with Path-Relinking for the p-Median Problem.Jos Elias Claudio Arroyo, Andr Gustavo dos Santos, Paula M. dos Santos, Wellington G. Ribeiro
2011GECCOMetaheuristic for parallel machines scheduling with resource-assignable sequence dependent setup times.Lus H. C. Bicalho, Andr Gustavo dos Santos, Jos Elias Claudio Arroyo
2011ISDAMulti-objective Variable Neighborhood Search algorithms for a just-in-time single machine scheduling problem.Jos Elias Claudio Arroyo, Rafael dos Santos Ottoni, Andr Gustavo dos Santos
2010HISA GRASP heuristic with Path-Relinking for a bi-objective p-median problem.Jos Elias Claudio Arroyo, Michele dos Santos Soares, Paula M. dos Santos
2009CECGenetic algorithm and local search for just-in-time job-shop scheduling.Rodolfo P. Araujo, Andr Gustavo dos Santos, Jos Elias Claudio Arroyo
2009HISIterative Local Search Heuristic for the Single Machine Scheduling Problem with Sequence Dependent Setup Times and Due Dates.Jos Elias Claudio Arroyo, Gilberto Vinicius P. Nunes, Edmar Hell Kamke
2008HISA GRASP with Path Relinking for the Single Machine Total Weighted Tardiness Problem.Jos Elias Claudio Arroyo, Andr Gustavo dos Santos, Fabrcio L. S. Silva, Alexandre F. Arajo
2008HISGenetic Algorithms for Bi-Objective Job Shop Scheduling Problem.Mayron Csar O. Moreira, Jos Elias Claudio Arroyo, Tiago O. Januario, Paulo L. de Oliveira Junior