| 2025 | WSC | Simulation in Semiconductor Manufacturing Between 2000 and 2050 Lessons Learned and Future Expectations. | John W. Fowler, Young Jae Jang, Adar Kalir, Peter Lendermann, Lars Mnch, Oliver Rose, Georg Seidel, Claude Yugma |
| 2025 | WSC | Modeling and Solving Complex Job-Shop Scheduling Problems for Reliability Laboratories. | Jessica Hautz, Andreas Klemmt, Lars Mnch |
| 2025 | WSC | A Hybrid Approach for Short-Term Demand Forecasting: A Computational Study. | Raphael Herding, Lars Mnch |
| 2025 | WSC | Solving Flexible Flow-Shop Scheduling Problems with Maximal Time Lags: A Computational Study. | Daniel Sascha Schorn, Lars Mnch |
| 2025 | WSC | Simulation-Based Optimization Approach for Solving Production Planning Problems. | Hajime Sekiya, Lars Mnch |
| 2024 | WSC | Reinforcement Learning for Unrelated Parallel Machine Scheduling with Release Dates, Setup Times, and Machine Eligibility. | Sang-Hyun Cho, Hyun-Jung Kim, Lars Mnch |
| 2024 | WSC | Scheduling Jobs on a Single Stress Test Machine in a Reliability Laboratory. | Jessica Hautz, Andreas Klemmt, Lars Mnch |
| 2024 | WSC | Borderless Fab Scenarios in Hierarchical Planning Settings: A Simulation Study. | Raphael Herding, Lars Mnch |
| 2023 | WSC | Exact and Heuristic Algorithms for a bi-criteria Order-Lot Pegging Problem in a Multi-Fab Setting. | Andreas Haspecker, Lars Mnch |
| 2023 | WSC | Agent-Based Decision Support in Borderless fab Scenarios in Semiconductor Manufacturing. | Raphael Herding, Lars Mnch |
| 2023 | WSC | Data-Driven Production Planning Formulations with Inventory Considerations. | Tobias Vlker, Lars Mnch |
| 2022 | WSC | Scheduling Jobs with Uncertain Ready Times on a Single Batch Processing Machine. | Jens Rocholl, Fajun Yang, Lars Mnch |
| 2022 | WSC | Learning Dispatching Rules for Energy-Aware Scheduling of Jobs on a Single Batch Processing Machine. | Daniel Sascha Schorn, Lars Mnch |
| 2022 | WSC | Impact of Production Planning Approaches on Wafer Fab Performance During Product Mix Changes. | Tobias Vlker, Lars Mnch, Reha Uzsoy |
| 2022 | WSC | A Planning Model for Incorporating Renewable Energy Sources into Semiconductor Supply Chains. | Michael Werner, Lars Mnch, Jei-Zheng Wu |
| 2021 | WSC | Production-Level Artificial Intelligence Applications in Semiconductor Manufacturing. | Chen-Fu Chien, Hans Ehm, John W. Fowler, Lars Mnch, Cheng-Hung Wu |
| 2021 | WSC | Design and Application of an Ontology for Demand Fulfillment in Semiconductor Supply Chains. | Raphael Herding, Lars Mnch, Hans Ehm |
| 2021 | WSC | Simulation-Based Performance Assessment of Sustainable Manufacturing Decisions. | Jens Rocholl, Lars Mnch |
| 2021 | WSC | Data-Driven Production Planning Formulations For Wafer Fabs: A Computational Study. | Tobias Vlker, Lars Mnch |
| 2020 | WSC | Integrating Critical Queue Time Constraints Into SMT2020 Simulation Models. | Denny Kopp, Michael Hassoun, Adar Kalir, Lars Mnch |
| 2020 | WSC | Scheduling and Simulation in wafer fabs: Competitors, Independent Players or Amplifiers? | Peter Lendermann, Stphane Dauzre-Prs, Leon F. McGinnis, Lars Mnch, Tina O'Donnell, Georg Seidel, Philippe Vialletelle |
| 2020 | WSC | Heuristics for Order-Lot Pegging In Multi-Fab Settings. | Lars Mnch, Liji Shen, John W. Fowler |
| 2019 | WSC | A New High-Volume/Low-Mix Simulation Testbed for Semiconductor Manufacturing. | Michael Hassoun, Denny Kopp, Lars Mnch, Adar Kalir |
| 2019 | WSC | Fast Heuristics for Making Qualification Management Decisions in Wafer Fabs. | Denny Kopp, Lars Mnch |
| 2019 | WSC | Integrated Planning of Production and Engineering Activities in Semiconductor Supply Chains: A Simulation Study. | Timm Ziarnetzky, Lars Mnch, Thomas Ponsignon, Hans Ehm |
| 2018 | WSC | A Hierarchical Approach to Qualification Management in wafer fabs. | Denny Kopp, Lars Mnch |
| 2018 | WSC | Reflections on Reference Modeling, simulation Testbeds, and reproducibility. | Lars Mnch |
| 2018 | WSC | Electricity Power Cost-Aware Scheduling of jobs on Parallel batch Processing Machines. | Jens Rocholl, Lars Mnch, John W. Fowler |
| 2017 | WSC | Simulation-based optimiziation to design equipment health-aware dispatching rules. | Lorenz Reinhardt, Lars Mnch |
| 2017 | WSC | Incorporating elements of a sustainable and distributed generation system into a production planning model for a wafer fab. | Timm Ziarnetzky, Lars Mnch, Thulasi Kannaian, Jess Jimnez |
| 2016 | WSC | An optimization model for qualification management in wafer fabs. | Denny Kopp, Lars Mnch, Detlef Pabst, Marcel Stehli |
| 2016 | WSC | Simulation-based optimization for integrated production planning and capacity expansion decisions. | Timm Ziarnetzky, Lars Mnch |
| 2015 | WSC | Using simulation to improve planning decisions in mixed-model assembly lines. | Alexander Biele, Lars Mnch |
| 2015 | WSC | Simulation-based performance assessment of production planning formulations for semiconductor wafer fabrication. | Timm Ziarnetzky, Necip Baris Kacar, Lars Mnch, Reha Uzsoy |
| 2014 | WSC | A decomposition heuristic for a two-machine flow shop with batch processing. | Yi Tan, Lars Mnch, John W. Fowler |
| 2014 | WSC | Simulation of low-volume mixed model assembly lines: modeling aspects and case study. | Timm Ziarnetzky, Lars Mnch, Alexander Biele |
| 2013 | CaiSE | Application of Intelligent Service Bus in a Ramp-up Production Context. | Csar A. Marn, Pavel Vrba, Paulo Leito, Lars Mnch, Georgios V. Lioudakis, Daria Kazanskaia, Vadim I. Chepegin, Liwei Liu, Jos Barbosa, Alexander Tsarev, Petr Skobelev, Nikolay Mehandjiev |
| 2013 | ICSOC | Tactical Service Selection with Runtime Aspects. | Ren Ramacher, Lars Mnch |
| 2013 | SMC | A Conceptual Architecture Based on Intelligent Services for Manufacturing Support Systems. | Csar A. Marn, Lars Mnch, Paulo Leito, Pavel Vrba, Daria Kazanskaia, Vadim I. Chepegin, Liwei Liu, Nikolay Mehandjiev |
| 2013 | WSC | A heuristic to support make-to-stock, assemble-to-order, and make-to-order decisions in semiconductor supply chains. | Lisa Forstner, Lars Mnch |
| 2013 | WSC | A comparison of production planning formulations with exogenous cycle time estimates using a large-scale wafer fab model. | Necip Baris Kacar, Lars Mnch, Reha Uzsoy |
| 2012 | ICSOC | Dynamic Service Selection with End-to-End Constrained Uncertain QoS Attributes. | Ren Ramacher, Lars Mnch |
| 2012 | WSC | A framework to schedule surgeries in an eye hospital. | Hanna Ewen, Lars Mnch |
| 2012 | WSC | A framework to schedule surgeries in an eye hospital. | Hanna Ewen, Lars Mnch |
| 2012 | WSC | Scheduling jobs with time constraints between consecutive process steps in semiconductor manufacturing. | Andreas Klemmt, Lars Mnch |
| 2012 | WSC | Using iterative simulation to incorporate load-dependent lead times in master planning heuristics. | Thomas Ponsignon, Lars Mnch |
| 2011 | WSC | Towards a supply chain simulation reference model for the semiconductor industry. | Hans Ehm, Thomas Ponsignon, Hanna Wenke, Lars Mnch, Lisa Forstner |
| 2011 | WSC | A comparison of heuristics to solve a single machine batching problem with unequal ready times of the jobs. | Oleh Sobeyko, Lars Mnch |
| 2010 | GI | A Computational Study of an Automated Negotiation Scheme to Solve Multiple Criterion Single Machine Scheduling Problems. | Ren Ramacher, Lars Mnch |
| 2010 | WSC | Architecture for simulation-based performance assessment of planning approaches in semiconductor manufacturing. | Thomas Ponsignon, Lars Mnch |
| 2010 | WSC | Genetic algorithms to solve a single machine multiple orders per job scheduling problem. | Oleh Sobeyko, Lars Mnch |
| 2009 | WSC | A Comparison of MIP-based Decomposition Techniques and VNS Approaches for Batch Scheduling Problems. | Andreas Klemmt, Gerald Weigert, Christian Almeder, Lars Mnch |
| 2009 | WSC | Modeling and Simulation of Cataract Surgery Processes. | Sonja Reindl, Lars Mnch, Maria Mnch, Andreas Scheider |
| 2009 | WSC | An Ant Colony Optimization Approach to Solve Cooperative Transportation Planning Problems. | Ralf Sprenger, Lars Mnch |
| 2008 | COMPSAC | An Ontology to Support Adaptive Agents for Complex Manufacturing Systems. | Lars Mnch, Jens Zimmermann |
| 2008 | WSC | Modeling and analysis of semiconductor manufacturing in a shrinking world: Challenges and successes. | Chen-Fu Chien, Stphane Dauzre-Prs, Hans Ehm, John W. Fowler, Zhibin Jiang, Shekar Krishnaswamy, Lars Mnch, Reha Uzsoy |
| 2008 | WSC | Solving volume and capacity planning problems in semiconductor manufaturing: A computational study. | Christoph Habla, Lars Mnch |
| 2008 | WSC | A simulation framework for assessing the performance of cooperative transportation planning algorithms. | Ralf Sprenger, Lars Mnch |
| 2008 | WSC | Determining an appropriate number of FOUPs in semiconductor wafer fabrication facilities. | Jens Zimmermann, Scott J. Mason, John W. Fowler, Lars Mnch |
| 2007 | WSC | Simulation framework for complex manufacturing systems with automated material handling. | Rene Driessel, Lars Mnch |
| 2006 | WSC | Simulation-based selection of machine criticality measures for a shifting bottleneck heuristic. | Jens Zimmermann, Lars Mnch |
| 2005 | WSC | Simulation-based assessment of order release strategies for a distributed shifting bottleneck heuristic. | Lars Mnch |
| 2004 | WSC | Improving the Performance of Dispatching Rules in Semiconductor Manufacturing by Iterative Simulation. | Lars Mnch, Jens Zimmermann |
| 2003 | GI | Agent.Enterprise - Integriertes Supply Chain Management mit hierarchisch vernetzten Multiagenten-Systemen. | Daniel Frey, Lars Mnch, Tim Stockheim, Peer-Oliver Woelk, Roland Zimmermann |
| 2003 | WSC | Factory scheduling and dispatching: simulation-based assessment of batching heuristics in semiconductor manufacturing. | Lars Mnch, Ilka Habenicht |
| 2002 | WSC | Scheduling and dispatching: a finite-capacity beam-search-algorithm for production scheduling in semiconductor manufacturing. | Ilka Habenicht, Lars Mnch |
| 2001 | WSC | Simulation-based solution of load-balancing problems in the photolithography area of a semiconductor wafer fabrication facility. | Lars Mnch, Matthias Prause, Volker Schmalfuss |