Skip to content

Lars Mnch

Publication record assembled from the DBLP archive of ranked conferences.

Papers indexed

67

Venues

6

Active years

2001–2025

Best venue rank

National

Where they publish

Papers

67 indexed papers, newest first.

YearVenueTitleAuthors
2025WSCSimulation in Semiconductor Manufacturing Between 2000 and 2050 Lessons Learned and Future Expectations.John W. Fowler, Young Jae Jang, Adar Kalir, Peter Lendermann, Lars Mnch, Oliver Rose, Georg Seidel, Claude Yugma
2025WSCModeling and Solving Complex Job-Shop Scheduling Problems for Reliability Laboratories.Jessica Hautz, Andreas Klemmt, Lars Mnch
2025WSCA Hybrid Approach for Short-Term Demand Forecasting: A Computational Study.Raphael Herding, Lars Mnch
2025WSCSolving Flexible Flow-Shop Scheduling Problems with Maximal Time Lags: A Computational Study.Daniel Sascha Schorn, Lars Mnch
2025WSCSimulation-Based Optimization Approach for Solving Production Planning Problems.Hajime Sekiya, Lars Mnch
2024WSCReinforcement Learning for Unrelated Parallel Machine Scheduling with Release Dates, Setup Times, and Machine Eligibility.Sang-Hyun Cho, Hyun-Jung Kim, Lars Mnch
2024WSCScheduling Jobs on a Single Stress Test Machine in a Reliability Laboratory.Jessica Hautz, Andreas Klemmt, Lars Mnch
2024WSCBorderless Fab Scenarios in Hierarchical Planning Settings: A Simulation Study.Raphael Herding, Lars Mnch
2023WSCExact and Heuristic Algorithms for a bi-criteria Order-Lot Pegging Problem in a Multi-Fab Setting.Andreas Haspecker, Lars Mnch
2023WSCAgent-Based Decision Support in Borderless fab Scenarios in Semiconductor Manufacturing.Raphael Herding, Lars Mnch
2023WSCData-Driven Production Planning Formulations with Inventory Considerations.Tobias Vlker, Lars Mnch
2022WSCScheduling Jobs with Uncertain Ready Times on a Single Batch Processing Machine.Jens Rocholl, Fajun Yang, Lars Mnch
2022WSCLearning Dispatching Rules for Energy-Aware Scheduling of Jobs on a Single Batch Processing Machine.Daniel Sascha Schorn, Lars Mnch
2022WSCImpact of Production Planning Approaches on Wafer Fab Performance During Product Mix Changes.Tobias Vlker, Lars Mnch, Reha Uzsoy
2022WSCA Planning Model for Incorporating Renewable Energy Sources into Semiconductor Supply Chains.Michael Werner, Lars Mnch, Jei-Zheng Wu
2021WSCProduction-Level Artificial Intelligence Applications in Semiconductor Manufacturing.Chen-Fu Chien, Hans Ehm, John W. Fowler, Lars Mnch, Cheng-Hung Wu
2021WSCDesign and Application of an Ontology for Demand Fulfillment in Semiconductor Supply Chains.Raphael Herding, Lars Mnch, Hans Ehm
2021WSCSimulation-Based Performance Assessment of Sustainable Manufacturing Decisions.Jens Rocholl, Lars Mnch
2021WSCData-Driven Production Planning Formulations For Wafer Fabs: A Computational Study.Tobias Vlker, Lars Mnch
2020WSCIntegrating Critical Queue Time Constraints Into SMT2020 Simulation Models.Denny Kopp, Michael Hassoun, Adar Kalir, Lars Mnch
2020WSCScheduling and Simulation in wafer fabs: Competitors, Independent Players or Amplifiers?Peter Lendermann, Stphane Dauzre-Prs, Leon F. McGinnis, Lars Mnch, Tina O'Donnell, Georg Seidel, Philippe Vialletelle
2020WSCHeuristics for Order-Lot Pegging In Multi-Fab Settings.Lars Mnch, Liji Shen, John W. Fowler
2019WSCA New High-Volume/Low-Mix Simulation Testbed for Semiconductor Manufacturing.Michael Hassoun, Denny Kopp, Lars Mnch, Adar Kalir
2019WSCFast Heuristics for Making Qualification Management Decisions in Wafer Fabs.Denny Kopp, Lars Mnch
2019WSCIntegrated Planning of Production and Engineering Activities in Semiconductor Supply Chains: A Simulation Study.Timm Ziarnetzky, Lars Mnch, Thomas Ponsignon, Hans Ehm
2018WSCA Hierarchical Approach to Qualification Management in wafer fabs.Denny Kopp, Lars Mnch
2018WSCReflections on Reference Modeling, simulation Testbeds, and reproducibility.Lars Mnch
2018WSCElectricity Power Cost-Aware Scheduling of jobs on Parallel batch Processing Machines.Jens Rocholl, Lars Mnch, John W. Fowler
2017WSCSimulation-based optimiziation to design equipment health-aware dispatching rules.Lorenz Reinhardt, Lars Mnch
2017WSCIncorporating elements of a sustainable and distributed generation system into a production planning model for a wafer fab.Timm Ziarnetzky, Lars Mnch, Thulasi Kannaian, Jess Jimnez
2016WSCAn optimization model for qualification management in wafer fabs.Denny Kopp, Lars Mnch, Detlef Pabst, Marcel Stehli
2016WSCSimulation-based optimization for integrated production planning and capacity expansion decisions.Timm Ziarnetzky, Lars Mnch
2015WSCUsing simulation to improve planning decisions in mixed-model assembly lines.Alexander Biele, Lars Mnch
2015WSCSimulation-based performance assessment of production planning formulations for semiconductor wafer fabrication.Timm Ziarnetzky, Necip Baris Kacar, Lars Mnch, Reha Uzsoy
2014WSCA decomposition heuristic for a two-machine flow shop with batch processing.Yi Tan, Lars Mnch, John W. Fowler
2014WSCSimulation of low-volume mixed model assembly lines: modeling aspects and case study.Timm Ziarnetzky, Lars Mnch, Alexander Biele
2013CaiSEApplication of Intelligent Service Bus in a Ramp-up Production Context.Csar A. Marn, Pavel Vrba, Paulo Leito, Lars Mnch, Georgios V. Lioudakis, Daria Kazanskaia, Vadim I. Chepegin, Liwei Liu, Jos Barbosa, Alexander Tsarev, Petr Skobelev, Nikolay Mehandjiev
2013ICSOCTactical Service Selection with Runtime Aspects.Ren Ramacher, Lars Mnch
2013SMCA Conceptual Architecture Based on Intelligent Services for Manufacturing Support Systems.Csar A. Marn, Lars Mnch, Paulo Leito, Pavel Vrba, Daria Kazanskaia, Vadim I. Chepegin, Liwei Liu, Nikolay Mehandjiev
2013WSCA heuristic to support make-to-stock, assemble-to-order, and make-to-order decisions in semiconductor supply chains.Lisa Forstner, Lars Mnch
2013WSCA comparison of production planning formulations with exogenous cycle time estimates using a large-scale wafer fab model.Necip Baris Kacar, Lars Mnch, Reha Uzsoy
2012ICSOCDynamic Service Selection with End-to-End Constrained Uncertain QoS Attributes.Ren Ramacher, Lars Mnch
2012WSCA framework to schedule surgeries in an eye hospital.Hanna Ewen, Lars Mnch
2012WSCA framework to schedule surgeries in an eye hospital.Hanna Ewen, Lars Mnch
2012WSCScheduling jobs with time constraints between consecutive process steps in semiconductor manufacturing.Andreas Klemmt, Lars Mnch
2012WSCUsing iterative simulation to incorporate load-dependent lead times in master planning heuristics.Thomas Ponsignon, Lars Mnch
2011WSCTowards a supply chain simulation reference model for the semiconductor industry.Hans Ehm, Thomas Ponsignon, Hanna Wenke, Lars Mnch, Lisa Forstner
2011WSCA comparison of heuristics to solve a single machine batching problem with unequal ready times of the jobs.Oleh Sobeyko, Lars Mnch
2010GIA Computational Study of an Automated Negotiation Scheme to Solve Multiple Criterion Single Machine Scheduling Problems.Ren Ramacher, Lars Mnch
2010WSCArchitecture for simulation-based performance assessment of planning approaches in semiconductor manufacturing.Thomas Ponsignon, Lars Mnch
2010WSCGenetic algorithms to solve a single machine multiple orders per job scheduling problem.Oleh Sobeyko, Lars Mnch
2009WSCA Comparison of MIP-based Decomposition Techniques and VNS Approaches for Batch Scheduling Problems.Andreas Klemmt, Gerald Weigert, Christian Almeder, Lars Mnch
2009WSCModeling and Simulation of Cataract Surgery Processes.Sonja Reindl, Lars Mnch, Maria Mnch, Andreas Scheider
2009WSCAn Ant Colony Optimization Approach to Solve Cooperative Transportation Planning Problems.Ralf Sprenger, Lars Mnch
2008COMPSACAn Ontology to Support Adaptive Agents for Complex Manufacturing Systems.Lars Mnch, Jens Zimmermann
2008WSCModeling and analysis of semiconductor manufacturing in a shrinking world: Challenges and successes.Chen-Fu Chien, Stphane Dauzre-Prs, Hans Ehm, John W. Fowler, Zhibin Jiang, Shekar Krishnaswamy, Lars Mnch, Reha Uzsoy
2008WSCSolving volume and capacity planning problems in semiconductor manufaturing: A computational study.Christoph Habla, Lars Mnch
2008WSCA simulation framework for assessing the performance of cooperative transportation planning algorithms.Ralf Sprenger, Lars Mnch
2008WSCDetermining an appropriate number of FOUPs in semiconductor wafer fabrication facilities.Jens Zimmermann, Scott J. Mason, John W. Fowler, Lars Mnch
2007WSCSimulation framework for complex manufacturing systems with automated material handling.Rene Driessel, Lars Mnch
2006WSCSimulation-based selection of machine criticality measures for a shifting bottleneck heuristic.Jens Zimmermann, Lars Mnch
2005WSCSimulation-based assessment of order release strategies for a distributed shifting bottleneck heuristic.Lars Mnch
2004WSCImproving the Performance of Dispatching Rules in Semiconductor Manufacturing by Iterative Simulation.Lars Mnch, Jens Zimmermann
2003GIAgent.Enterprise - Integriertes Supply Chain Management mit hierarchisch vernetzten Multiagenten-Systemen.Daniel Frey, Lars Mnch, Tim Stockheim, Peer-Oliver Woelk, Roland Zimmermann
2003WSCFactory scheduling and dispatching: simulation-based assessment of batching heuristics in semiconductor manufacturing.Lars Mnch, Ilka Habenicht
2002WSCScheduling and dispatching: a finite-capacity beam-search-algorithm for production scheduling in semiconductor manufacturing.Ilka Habenicht, Lars Mnch
2001WSCSimulation-based solution of load-balancing problems in the photolithography area of a semiconductor wafer fabrication facility.Lars Mnch, Matthias Prause, Volker Schmalfuss