| 2021 | ISTAS | A framework for asset management planning in sustainable and resilient cities. | Rebecca Dziedzic, Luis Amador, Chunjiang An, Zhi Chen, Ursula Eicker, Amin Hammad, Fuzhan Nasiri, Mazdak Nik-Bakht, Mohamed Ouf, Osama Moselhi |
| 2013 | IFSA | Fuzzy dynamic programming for optimized scheduling of repetitive construction projects. | Ibrahim Bakry, Osama Moselhi, Tarek M. Zayed |
| 2013 | IFSA | Quantitative and qualitative risk in EPCM projects using fuzzy set theory. | Ahmad Salah, Osama Moselhi |
| 2013 | WSC | Assessment of construction operations productivity rate as computed by simulation models. | Hani Alzraiee, Tarek M. Zayed, Osama Moselhi |
| 2012 | WSC | Integrating discrete event simulation (DES) and system dynamics (SD) on single platform for simulating construction operations. | Hani Alzraiee, Osama Moselhi, Tarek M. Zayed |
| 2012 | WSC | Integrating discrete event simulation (DES) and system dynamics (SD) on single platform for simulating construction operations. | Hani Alzraiee, Osama Moselhi, Tarek M. Zayed |
| 2012 | WSC | Methodology for synchronizing discrete event simulation and system dynamics models. | Hani Alzraiee, Tarek M. Zayed, Osama Moselhi |
| 2002 | WSC | CEPM 1: selecting earthmoving equipment fleets using genetic algorithms. | Mohamed M. Marzouk, Osama Moselhi |
| 2001 | WSC | On the use of fuzzy clustering in construction simulation. | Mohamed M. Marzouk, Osama Moselhi |
| 2000 | WSC | Optimizing earthmoving operations using object-oriented simulation. | Mohamed M. Marzouk, Osama Moselhi |