Skip to content

Patrick Preuss

Publication record assembled from the DBLP archive of ranked conferences.

Papers indexed

12

Venues

1

Active years

2010–2023

Best venue rank

National

Where they publish

Papers

12 indexed papers, newest first.

YearVenueTitleAuthors
2023WSCBackward Simulation: A Customer-Focused Diversification of Fab Simulation Applications in a Highly Automated Semiconductor Production Line.Wolfgang Scholl, Patrick Preuss, Christoph Laroque, Madlene Leiau
2019WSCAn Integration of Static and Dynamic Capacity Planning for a Ramping Fab.Georg Seidel, Patrick Preuss, Cevahir Canbolat, Soo Leen Low, Chew Wye Chan, Boon Ping Gan, Ching Foong Lee, Prakash Manogaran, Aik Ying Tang
2018WSCBridging the Gap between fab simulation and supply Chain Forecast.Wolfgang Scholl, Matthias Forster, Patrick Preuss, Andr Naumann, Hui Ping Ooi, Boon-Ping Gan
2018WSCOperator Resource modelling in a Multiple wafer Sizes fabrication Environment using discrete Event simulation.Georg Seidel, Patrick Preuss, Andr Naumann, Soo Leen Low, Chew Wye Chan, Boon-Ping Gan
2017WSCAn easy approach to extending a short term simulation model for long term forecast in semiconductor industry.Marcin Mosinski, Tobias Weissgaerber, Soo Leen Low, Boon-Ping Gan, Patrick Preuss
2017WSCHarmonizing operations management of key stakeholders in wafer fab using discrete event simulation.Georg Seidel, Ching Foong Lee, Ai Mei Kam, Boon-Ping Gan, Chew Wye Chan, Andr Naumann, Patrick Preuss
2016WSCSimulation-enabled development lot journey smoothening in a fully-utilised semiconductor manufacturing line.Wolfgang Scholl, Matthias Forster, Patrick Preuss, Andr Naumann, Boon-Ping Gan, Peter Lendermann
2014WSCEnhancement of simulation-based semiconductor manufacturing forecast quality through hybrid tool down time modeling.Patrick Preuss, Andr Naumann, Wolfgang Scholl, Boon-Ping Gan, Peter Lendermann
2013WSCAutomatic model verification for semiconductor manufacturing simulation.Boon-Ping Gan, Peter Lendermann, Wolfgang Scholl, Marcin Mosinski, Patrick Preuss
2012WSCA multi-stage discrete event simulation approach for scheduling of maintenance activities in a semiconductor manufacturing line.Wolfgang Scholl, Marcin Mosinski, Boon-Ping Gan, Peter Lendermann, Patrick Preuss, Daniel Noack
2011WSCImplementation of a simulation-based short-term lot arrival forecast in a mature 200mm semiconductor fab.Wolfgang Scholl, Daniel Noack, Oliver Rose, Boon-Ping Gan, Peter Lendermann, Patrick Preuss, Falk Stefan Pappert
2010WSCTowards realization of a high-fidelity simulation model for short-term horizon forecasting in wafer fabrication facilities.Wolfgang Scholl, Boon-Ping Gan, Ming Li Peh, Peter Lendermann, Daniel Noack, Oliver Rose, Patrick Preuss