Skip to content

Peter Lendermann

Publication record assembled from the DBLP archive of ranked conferences.

Papers indexed

34

Venues

3

Active years

2001–2025

Best venue rank

National

Where they publish

Papers

34 indexed papers, newest first.

YearVenueTitleAuthors
2025WSCSimulation in Semiconductor Manufacturing Between 2000 and 2050 Lessons Learned and Future Expectations.John W. Fowler, Young Jae Jang, Adar Kalir, Peter Lendermann, Lars Mnch, Oliver Rose, Georg Seidel, Claude Yugma
2021WSCUsing Simulation and Digital Twins to Innovate: Are we Getting Smarter?Simon J. E. Taylor, Bjrn Johansson, Sumin Jeon, Loo Hay Lee, Peter Lendermann, Guodong Shao
2020WSCScheduling and Simulation in wafer fabs: Competitors, Independent Players or Amplifiers?Peter Lendermann, Stphane Dauzre-Prs, Leon F. McGinnis, Lars Mnch, Tina O'Donnell, Georg Seidel, Philippe Vialletelle
2019WSCDigital Twin for Smart Manufacturing: The Simulation Aspect.Guodong Shao, Sanjay Jain, Christoph Laroque, Loo Hay Lee, Peter Lendermann, Oliver Rose
2016WSCSimulation-enabled development lot journey smoothening in a fully-utilised semiconductor manufacturing line.Wolfgang Scholl, Matthias Forster, Patrick Preuss, Andr Naumann, Boon-Ping Gan, Peter Lendermann
2014WSCEnhancement of simulation-based semiconductor manufacturing forecast quality through hybrid tool down time modeling.Patrick Preuss, Andr Naumann, Wolfgang Scholl, Boon-Ping Gan, Peter Lendermann
2013WSCAutomatic model verification for semiconductor manufacturing simulation.Boon-Ping Gan, Peter Lendermann, Wolfgang Scholl, Marcin Mosinski, Patrick Preuss
2012WSCInitial provisioning and spare parts inventory network optimisation in a multi maintenance base environment.Peter Lendermann, Annamalai Thirunavukkarasu, Malcolm Yoke Hean Low, Leon F. McGinnis
2012WSCA multi-stage discrete event simulation approach for scheduling of maintenance activities in a semiconductor manufacturing line.Wolfgang Scholl, Marcin Mosinski, Boon-Ping Gan, Peter Lendermann, Patrick Preuss, Daniel Noack
2011WSCChallenges and solution approaches for the online simulation of semiconductor wafer fabs.Daniel Noack, Marcin Mosinski, Oliver Rose, Peter Lendermann, Boon-Ping Gan, Wolfgang Scholl
2011WSCImplementation of a simulation-based short-term lot arrival forecast in a mature 200mm semiconductor fab.Wolfgang Scholl, Daniel Noack, Oliver Rose, Boon-Ping Gan, Peter Lendermann, Patrick Preuss, Falk Stefan Pappert
2010WSCUnlocking value from component exchange contracts in aviation using simulation-based optimisation.Peter Lendermann, Boon-Ping Gan, Nirupam Julka, Arnd Schirrmann, Gan Helge Fromm
2010WSCTowards realization of a high-fidelity simulation model for short-term horizon forecasting in wafer fabrication facilities.Wolfgang Scholl, Boon-Ping Gan, Ming Li Peh, Peter Lendermann, Daniel Noack, Oliver Rose, Patrick Preuss
2008ICCSSymbiotic Simulation Control in Semiconductor Manufacturing.Heiko Aydt, Stephen John Turner, Wentong Cai, Malcolm Yoke Hean Low, Peter Lendermann, Boon-Ping Gan
2008WSCPreventive what-if analysis in symbiotic simulation.Heiko Aydt, Stephen John Turner, Wentong Cai, Malcolm Yoke Hean Low, Peter Lendermann, Boon-Ping Gan, Rassul Ayani
2008WSCSimulation analysis of cluster tool operations in wafer fabrication.Amit Kumar Gupta, Peter Lendermann, Appa Iyer Sivakumar, John Priyadi
2008WSCAn optimization framework for waferfab performance enhancement.Daniel Noack, Boon-Ping Gan, Peter Lendermann, Oliver Rose
2007WSCDistributed simulation in industry - a real-world necessity or ivory tower fancy?: panel.Peter Lendermann, Matthias U. Heinicke, Leon F. McGinnis, Charles R. McLean, Steffen Straburger, Simon J. E. Taylor
2007WSCSymbiotic simulation for business process re-engineering in high-tech manufacturing and service networks.Malcolm Y. H. Low, Stephen John Turner, Ding Ling, Hai L. Peng, Lai Peng Chan, Peter Lendermann, Stephen J. Buckley
2006PADSDistributed Simulation in Manufacturing and Logistics.Peter Lendermann
2006WSCSimulation analysis on the impact of furnace batch size increase in a deposition loop.Boon-Ping Gan, Peter Lendermann, Kelvin Paht Te Quek, Bart van der Heijden, Chen Chong Chin, Choon Yap Koh
2006WSCAbout the need for distributed simulation technology for the resolution of real-world manufacturing and logistics problems.Peter Lendermann
2005WSCInteroperating autosched AP using the high level architecture.Boon-Ping Gan, Peter Lendermann, Malcolm Yoke Hean Low, Stephen John Turner, Xiaoguang Wang, Simon J. E. Taylor
2005WSCApplication of multi-objective simulation-optimization techniques to inventory management problems.Loo Hay Lee, Suyan Teng, Ek Peng Chew, Iftekhar A. Karimi, Kong Wei Lye, Peter Lendermann, Yankai Chen, Choon Hwee Koh
2005WSCAn integrated and adaptive decision-support framework for high-tech manufacturing and service networks.Peter Lendermann, Malcolm Y. H. Low, Boon-Ping Gan, Nirupam Julka, Lai Peng Chan, Loo Hay Lee, Simon J. E. Taylor, Stephen John Turner, Wentong Cai, Xiaoguang Wang, Terence Hung, Leon F. McGinnis, Stephen J. Buckley
2004WSCAnalysis of a Customer Demand Driven Semiconductor Supply Chain in a Distributed Simulation Test Bed.Chin Soon Chong, Peter Lendermann, Boon-Ping Gan, Brett Marc Duarte, John W. Fowler, Thomas E. Callarman
2004WSCAnalysis and Enhancement of Planning and Scheduling Applications in a Distributed Simulation Testbed.Nirupam Julka, Peter Lendermann, Chin Soon Chong, Long-Foong Mike Liow
2004WSCAnalysis of a Borderless Fab Scenario in a Distributed Simulation Testbed.Peter Lendermann, Boon-Ping Gan, Yoon Loong Loh, Hiap Keong Tan, Sip Khean Lieu, John W. Fowler, Leon F. McGinnis
2004WSCPanel on Future Challenges in Modeling Methodology.Simon J. E. Taylor, Peter Lendermann, Ray J. Paul, Steven W. Reichenthal, Steffen Straburger, Stephen John Turner
2003WSCFuture of the simulation industry, panel: the future of the simulation industry.Jerry Banks, Joseph Hugan, Peter Lendermann, Charles R. McLean, Ernest H. Page, Claude Dennis Pegden, Onur M. lgen, James R. Wilson
2003WSCThe process of process reengineering: integration of discrete event simulation models with framework-based business applications.Peter Lendermann, Nirupam Julka, Lai Peng Chan, Boon-Ping Gan
2003WSCSimulation test bed for manufacturing analysis: benchmarking of a stochastic production planning model in a simulation testbed.Germn Riao, Richard F. Serfozo, Steven Hackman, Szu Hui Ng, Lai Peng Chan, Peter Lendermann
2002WSCSupply chain opportunities: panel session: opportunities for simulation in supply chain management.Jerry Banks, Sanjay Jain, Stephen J. Buckley, Peter Lendermann, Mani S. Manivannan
2001WSCDistributed simulation with incorporated APS procedures for high-fidelity supply chain optimization.Peter Lendermann, Boon-Ping Gan, Leon F. McGinnis