Peter Lendermann
Publication record assembled from the DBLP archive of ranked conferences.
Papers indexed
34
Venues
3
Active years
2001–2025
Best venue rank
National
Where they publish
Papers
34 indexed papers, newest first.
| Year | Venue | Title | Authors |
|---|---|---|---|
| 2025 | WSC | Simulation in Semiconductor Manufacturing Between 2000 and 2050 Lessons Learned and Future Expectations. | John W. Fowler, Young Jae Jang, Adar Kalir, Peter Lendermann, Lars Mnch, Oliver Rose, Georg Seidel, Claude Yugma |
| 2021 | WSC | Using Simulation and Digital Twins to Innovate: Are we Getting Smarter? | Simon J. E. Taylor, Bjrn Johansson, Sumin Jeon, Loo Hay Lee, Peter Lendermann, Guodong Shao |
| 2020 | WSC | Scheduling and Simulation in wafer fabs: Competitors, Independent Players or Amplifiers? | Peter Lendermann, Stphane Dauzre-Prs, Leon F. McGinnis, Lars Mnch, Tina O'Donnell, Georg Seidel, Philippe Vialletelle |
| 2019 | WSC | Digital Twin for Smart Manufacturing: The Simulation Aspect. | Guodong Shao, Sanjay Jain, Christoph Laroque, Loo Hay Lee, Peter Lendermann, Oliver Rose |
| 2016 | WSC | Simulation-enabled development lot journey smoothening in a fully-utilised semiconductor manufacturing line. | Wolfgang Scholl, Matthias Forster, Patrick Preuss, Andr Naumann, Boon-Ping Gan, Peter Lendermann |
| 2014 | WSC | Enhancement of simulation-based semiconductor manufacturing forecast quality through hybrid tool down time modeling. | Patrick Preuss, Andr Naumann, Wolfgang Scholl, Boon-Ping Gan, Peter Lendermann |
| 2013 | WSC | Automatic model verification for semiconductor manufacturing simulation. | Boon-Ping Gan, Peter Lendermann, Wolfgang Scholl, Marcin Mosinski, Patrick Preuss |
| 2012 | WSC | Initial provisioning and spare parts inventory network optimisation in a multi maintenance base environment. | Peter Lendermann, Annamalai Thirunavukkarasu, Malcolm Yoke Hean Low, Leon F. McGinnis |
| 2012 | WSC | A multi-stage discrete event simulation approach for scheduling of maintenance activities in a semiconductor manufacturing line. | Wolfgang Scholl, Marcin Mosinski, Boon-Ping Gan, Peter Lendermann, Patrick Preuss, Daniel Noack |
| 2011 | WSC | Challenges and solution approaches for the online simulation of semiconductor wafer fabs. | Daniel Noack, Marcin Mosinski, Oliver Rose, Peter Lendermann, Boon-Ping Gan, Wolfgang Scholl |
| 2011 | WSC | Implementation of a simulation-based short-term lot arrival forecast in a mature 200mm semiconductor fab. | Wolfgang Scholl, Daniel Noack, Oliver Rose, Boon-Ping Gan, Peter Lendermann, Patrick Preuss, Falk Stefan Pappert |
| 2010 | WSC | Unlocking value from component exchange contracts in aviation using simulation-based optimisation. | Peter Lendermann, Boon-Ping Gan, Nirupam Julka, Arnd Schirrmann, Gan Helge Fromm |
| 2010 | WSC | Towards realization of a high-fidelity simulation model for short-term horizon forecasting in wafer fabrication facilities. | Wolfgang Scholl, Boon-Ping Gan, Ming Li Peh, Peter Lendermann, Daniel Noack, Oliver Rose, Patrick Preuss |
| 2008 | ICCS | Symbiotic Simulation Control in Semiconductor Manufacturing. | Heiko Aydt, Stephen John Turner, Wentong Cai, Malcolm Yoke Hean Low, Peter Lendermann, Boon-Ping Gan |
| 2008 | WSC | Preventive what-if analysis in symbiotic simulation. | Heiko Aydt, Stephen John Turner, Wentong Cai, Malcolm Yoke Hean Low, Peter Lendermann, Boon-Ping Gan, Rassul Ayani |
| 2008 | WSC | Simulation analysis of cluster tool operations in wafer fabrication. | Amit Kumar Gupta, Peter Lendermann, Appa Iyer Sivakumar, John Priyadi |
| 2008 | WSC | An optimization framework for waferfab performance enhancement. | Daniel Noack, Boon-Ping Gan, Peter Lendermann, Oliver Rose |
| 2007 | WSC | Distributed simulation in industry - a real-world necessity or ivory tower fancy?: panel. | Peter Lendermann, Matthias U. Heinicke, Leon F. McGinnis, Charles R. McLean, Steffen Straburger, Simon J. E. Taylor |
| 2007 | WSC | Symbiotic simulation for business process re-engineering in high-tech manufacturing and service networks. | Malcolm Y. H. Low, Stephen John Turner, Ding Ling, Hai L. Peng, Lai Peng Chan, Peter Lendermann, Stephen J. Buckley |
| 2006 | PADS | Distributed Simulation in Manufacturing and Logistics. | Peter Lendermann |
| 2006 | WSC | Simulation analysis on the impact of furnace batch size increase in a deposition loop. | Boon-Ping Gan, Peter Lendermann, Kelvin Paht Te Quek, Bart van der Heijden, Chen Chong Chin, Choon Yap Koh |
| 2006 | WSC | About the need for distributed simulation technology for the resolution of real-world manufacturing and logistics problems. | Peter Lendermann |
| 2005 | WSC | Interoperating autosched AP using the high level architecture. | Boon-Ping Gan, Peter Lendermann, Malcolm Yoke Hean Low, Stephen John Turner, Xiaoguang Wang, Simon J. E. Taylor |
| 2005 | WSC | Application of multi-objective simulation-optimization techniques to inventory management problems. | Loo Hay Lee, Suyan Teng, Ek Peng Chew, Iftekhar A. Karimi, Kong Wei Lye, Peter Lendermann, Yankai Chen, Choon Hwee Koh |
| 2005 | WSC | An integrated and adaptive decision-support framework for high-tech manufacturing and service networks. | Peter Lendermann, Malcolm Y. H. Low, Boon-Ping Gan, Nirupam Julka, Lai Peng Chan, Loo Hay Lee, Simon J. E. Taylor, Stephen John Turner, Wentong Cai, Xiaoguang Wang, Terence Hung, Leon F. McGinnis, Stephen J. Buckley |
| 2004 | WSC | Analysis of a Customer Demand Driven Semiconductor Supply Chain in a Distributed Simulation Test Bed. | Chin Soon Chong, Peter Lendermann, Boon-Ping Gan, Brett Marc Duarte, John W. Fowler, Thomas E. Callarman |
| 2004 | WSC | Analysis and Enhancement of Planning and Scheduling Applications in a Distributed Simulation Testbed. | Nirupam Julka, Peter Lendermann, Chin Soon Chong, Long-Foong Mike Liow |
| 2004 | WSC | Analysis of a Borderless Fab Scenario in a Distributed Simulation Testbed. | Peter Lendermann, Boon-Ping Gan, Yoon Loong Loh, Hiap Keong Tan, Sip Khean Lieu, John W. Fowler, Leon F. McGinnis |
| 2004 | WSC | Panel on Future Challenges in Modeling Methodology. | Simon J. E. Taylor, Peter Lendermann, Ray J. Paul, Steven W. Reichenthal, Steffen Straburger, Stephen John Turner |
| 2003 | WSC | Future of the simulation industry, panel: the future of the simulation industry. | Jerry Banks, Joseph Hugan, Peter Lendermann, Charles R. McLean, Ernest H. Page, Claude Dennis Pegden, Onur M. lgen, James R. Wilson |
| 2003 | WSC | The process of process reengineering: integration of discrete event simulation models with framework-based business applications. | Peter Lendermann, Nirupam Julka, Lai Peng Chan, Boon-Ping Gan |
| 2003 | WSC | Simulation test bed for manufacturing analysis: benchmarking of a stochastic production planning model in a simulation testbed. | Germn Riao, Richard F. Serfozo, Steven Hackman, Szu Hui Ng, Lai Peng Chan, Peter Lendermann |
| 2002 | WSC | Supply chain opportunities: panel session: opportunities for simulation in supply chain management. | Jerry Banks, Sanjay Jain, Stephen J. Buckley, Peter Lendermann, Mani S. Manivannan |
| 2001 | WSC | Distributed simulation with incorporated APS procedures for high-fidelity supply chain optimization. | Peter Lendermann, Boon-Ping Gan, Leon F. McGinnis |