| 2009 | CP | Constraint-Based Schedulers, Do They Really Work? | Philippe Baptiste |
| 2009 | CSR | Integrality Property in Preemptive Parallel Machine Scheduling. | Philippe Baptiste, Jacques Carlier, Alexander V. Kononov, Maurice Queyranne, Sergey Sevastyanov, Maxim Sviridenko |
| 2008 | COCOA | Fast Computation of Point-to-Point Paths on Time-Dependent Road Networks. | Giacomo Nannicini, Philippe Baptiste, Daniel Krob, Leo Liberti |
| 2007 | ESA | Polynomial Time Algorithms for Minimum Energy Scheduling. | Philippe Baptiste, Marek Chrobak, Christoph Drr |
| 2006 | SODA | Scheduling unit tasks to minimize the number of idle periods: a polynomial time algorithm for offline dynamic power management. | Philippe Baptiste |
| 2005 | CP | Inter-distance Constraint: An Extension of the All-Different Constraint for Scheduling Equal Length Jobs. | Konstantin Artiouchine, Philippe Baptiste |
| 2002 | SMC | Exact procedures for single machine total cost scheduling. | Antoine Jouglet, Philippe Baptiste, Jacques Carlier |
| 1998 | CP | Global Constraints for Partial CSPs: A Case-Study of Resource and Due Date Constraints. | Philippe Baptiste, Claude Le Pape, Laurent Pridy |
| 1997 | CP | Constraint Propagation and Decomposition Techniques for Highly Disjunctive and Highly Cumulative Project Scheduling Problems. | Philippe Baptiste, Claude Le Pape |
| 1996 | ECAI | Constraint Propagation Techniques for Disjunctive Scheduling: The Preemptive Case. | Claude Le Pape, Philippe Baptiste |
| 1995 | IJCAI | A Theoretical and Experimental Comparison of Constraint Propagation Techniques for Disjunctive Scheduling. | Philippe Baptiste, Claude Le Pape |