Skip to content

Piotr Jedrzejowicz

Publication record assembled from the DBLP archive of ranked conferences.

Papers indexed

84

Venues

18

Active years

1988–2025

Best venue rank

B

Where they publish

Papers

84 indexed papers, newest first.

YearVenueTitleAuthors
2025KESA Comparative Study of Oversampling Techniques for Imbalanced Network Attack Detection.Veronika Hordieieva, Ireneusz Czarnowski, Piotr Jedrzejowicz
2025KESParallelized Population-based Multi-heuristic Approach for Solving RCPSP/max.Piotr Jedrzejowicz, Ewa Ratajczak-Ropel
2025KESBinary transformer-based classifier.Piotr Jedrzejowicz, Ewa Ratajczak-Ropel, Izabela Wierzbowska
2025KESA differential evolution algorithm for discrete-continuous scheduling.Aleksander Skakovski, Piotr Jedrzejowicz
2025SGAITransformer-Based and Generative Classifiers for Mining Imbalanced Datasets.Piotr Jedrzejowicz, Izabela Wierzbowska
2024ICCCICollective Computational Intelligence Challenges and Opportunities.Piotr Jedrzejowicz
2024ICCCIParallelized Population-Based Multi-heuristic Approach for Solving RCPSP and MRCPSP Instances.Piotr Jedrzejowicz, Ewa Ratajczak-Ropel
2024KESAn efficient hybrid evolutionary algorithm for solving the traveling salesman problem.Piotr Jedrzejowicz, Krzysztof Keller, Aleksander Skakovski
2023FedCSISMushroom Picking Framework with Cache Memories for Solving Job Shop Scheduling Problem.Piotr Jedrzejowicz, Izabela Wierzbowska
2023FedCSISParallelized Population-Based Multi-Heuristic System with Reinforcement Learning for Solving Multi-Skill Resource-Constrained Project Scheduling Problem with Hierarchical Skills.Ewa Ratajczak-Ropel, Piotr Jedrzejowicz
2023ICCCIMining Multiple Class Imbalanced Datasets Using a Specialized Balancing Algorithm and the Adaboost Technique.Joanna Jedrzejowicz, Piotr Jedrzejowicz
2023ICCSBalancing Agents for Mining Imbalanced Multiclass Datasets - Performance Evaluation.Joanna Jedrzejowicz, Piotr Jedrzejowicz
2022ICCCIOversampling for Mining Imbalanced Datasets: Taxonomy and Performance Evaluation.Piotr Jedrzejowicz
2022ICCSCollective of Base Classifiers for Mining Imbalanced Data.Joanna Jedrzejowicz, Piotr Jedrzejowicz
2022KESBicriteria Oversampling for Imbalanced Data Classification.Joanna Jedrzejowicz, Piotr Jedrzejowicz
2022KESA-Team Solving Multi-Skill Resource-Constrained Project Scheduling Problem.Piotr Jedrzejowicz, Ewa Ratajczak-Ropel
2022KESImplementation of the Mushroom Picking Framework for Solving Flexible Job Shop Scheduling Problems in Parallel.Piotr Jedrzejowicz, Izabela Wierzbowska
2021ICCCIImbalanced Data Mining Using Oversampling and Cellular GEP Ensemble.Joanna Jedrzejowicz, Piotr Jedrzejowicz
2021ICCCIA Population-Based Framework for Solving the Job Shop Scheduling Problem.Piotr Jedrzejowicz, Ewa Ratajczak-Ropel, Izabela Wierzbowska
2021ICCSThe Power of a Collective: Team of Agents Solving Instances of the Flow Shop and Job Shop Problems.Piotr Jedrzejowicz, Izabela Wierzbowska
2020KESGEP-based classifier with drift detection for mining imbalanced data streams.Joanna Jedrzejowicz, Piotr Jedrzejowicz
2019ICCCIAn Approach to Imbalanced Data Classification Based on Instance Selection and Over-Sampling.Ireneusz Czarnowski, Piotr Jedrzejowicz
2019ICCCICurrent Trends in the Population-Based Optimization.Piotr Jedrzejowicz
2018ICCCICluster-Based Instance Selection for the Imbalanced Data Classification.Ireneusz Czarnowski, Piotr Jedrzejowicz
2018ICCCIParallel GEP Ensemble for Classifying Big Datasets.Joanna Jedrzejowicz, Piotr Jedrzejowicz, Izabela Wierzbowska
2018ICCCIA-Team Solving Distributed Resource-Constrained Multi-project Scheduling Problem.Piotr Jedrzejowicz, Ewa Ratajczak-Ropel
2018INISTAFirefly Algorithm for the RBF Network Design.Ireneusz Czarnowski, Piotr Jedrzejowicz
2018SGAIGEP-Based Ensemble Classifier with Drift-Detection.Joanna Jedrzejowicz, Piotr Jedrzejowicz
2017ICCCIGene Expression Programming Ensemble for Classifying Big Datasets.Joanna Jedrzejowicz, Piotr Jedrzejowicz
2017INISTAStacking and rotation-based technique for machine learning classification with data reduction.Ireneusz Czarnowski, Piotr Jedrzejowicz
2017INISTAPreface.Piotr Jedrzejowicz, Tulay Yildirim, Ireneusz Czarnowski
2016ICCCIBi-criteria Data Reduction for Instance-Based Classification.Ireneusz Czarnowski, Joanna Jedrzejowicz, Piotr Jedrzejowicz
2016ICCCIDynamic Cooperative Interaction Strategy for Solving RCPSP by a Team of Agents.Piotr Jedrzejowicz, Ewa Ratajczak-Ropel
2016SMCAn approach to machine classification based on stacked generalization and instance selection.Ireneusz Czarnowski, Piotr Jedrzejowicz
2015ICCCICluster-Dependent Feature Selection for the RBF Networks.Ireneusz Czarnowski, Piotr Jedrzejowicz
2015ICCCIA Hybrid Distance-Based and Naive Bayes Online Classifier.Joanna Jedrzejowicz, Piotr Jedrzejowicz
2014ACIIDSOnline Learning Based on Prototypes.Ireneusz Czarnowski, Piotr Jedrzejowicz
2014ACIIDSA Family of the Online Distance-Based Classifiers.Joanna Jedrzejowicz, Piotr Jedrzejowicz
2014ACIIDSReinforcement Learning Strategy for Solving the Resource-Constrained Project Scheduling Problem by a Team of A-Teams.Piotr Jedrzejowicz, Ewa Ratajczak-Ropel
2014KESEnsemble Classifier for Mining Data Streams.Ireneusz Czarnowski, Piotr Jedrzejowicz
2014KESIsland-based Differential Evolution Algorithm for the Discrete-continuous Scheduling with Continuous Resource Discretisation.Piotr Jedrzejowicz, Aleksander Skakovski
2013ICAISCAgent-Based Population Learning Algorithm for RBF Network Tuning.Ireneusz Czarnowski, Piotr Jedrzejowicz
2013ICCCIAgent-Based Data Reduction Using Ensemble Technique.Ireneusz Czarnowski, Piotr Jedrzejowicz
2013ICCCIOnline Classifiers Based on Fuzzy C-means Clustering.Joanna Jedrzejowicz, Piotr Jedrzejowicz
2013ICCCIReinforcement Learning Strategy for A-Team Solving the Resource-Constrained Project Scheduling Problem.Piotr Jedrzejowicz, Ewa Ratajczak-Ropel
2012ICCCIAgent-Based Approach to RBF Network Training with Floating Centroids.Ireneusz Czarnowski, Piotr Jedrzejowicz
2012ICCCIA-Team for Solving the Resource Availability Cost Problem.Piotr Jedrzejowicz, Ewa Ratajczak-Ropel
2012ICCCIStudy of the Migration Scheme Influence on Performance of A-Teams Solving the Job Shop Scheduling Problem.Piotr Jedrzejowicz, Izabela Wierzbowska
2012KESAn Approach to Cluster Initialization for RBF Networks.Ireneusz Czarnowski, Piotr Jedrzejowicz
2012KESCombined classifier constructed from the reduced dataset obtained using fuzzy C-means and differential evolution algorithms.Joanna Jedrzejowicz, Piotr Jedrzejowicz
2012KESTeam of A-Teams for Solving the Resource-Constrained Project Scheduling Problem.Piotr Jedrzejowicz, Ewa Ratajczak-Ropel
2012KESImpact of Migration Topologies on Performance of Teams of A-Teams.Piotr Jedrzejowicz, Izabela Wierzbowska
2011ICCCIParallel Cooperating A-Teams.Dariusz Barbucha, Ireneusz Czarnowski, Piotr Jedrzejowicz, Ewa Ratajczak-Ropel, Izabela Wierzbowska
2011ICCCIExperimental Evaluation of the Agent-Based Population Learning Algorithm for the Cluster-Based Instance Selection.Ireneusz Czarnowski, Piotr Jedrzejowicz
2011ICCCIDouble-Action Agents Solving the MRCPSP/Max Problem.Piotr Jedrzejowicz, Ewa Ratajczak-Ropel
2011SMCA consensus-based approach to the distributed learning.Ireneusz Czarnowski, Piotr Jedrzejowicz
2010ICCCICluster Integration for the Cluster-Based Instance Selection.Ireneusz Czarnowski, Piotr Jedrzejowicz
2010ICCCICellular GEP-Induced Classifiers.Joanna Jedrzejowicz, Piotr Jedrzejowicz
2010ICCCIEvaluation of Agents Performance within the A-Team Solving RCPSP/Max Problem.Piotr Jedrzejowicz, Ewa Ratajczak-Ropel
2010ICCCIA Cross-Entropy Based Population Learning Algorithm for Multi-mode Resource-Constrained Project Scheduling Problem with Minimum and Maximum Time Lags.Piotr Jedrzejowicz, Aleksander Skakovski
2009ICAARTDistributed Learning Algorithm based on Data Reduction.Ireneusz Czarnowski, Piotr Jedrzejowicz
2009ICCCIA-Teams and Their Applications.Piotr Jedrzejowicz
2009ICCCIA Family of GEP-Induced Ensemble Classifiers.Joanna Jedrzejowicz, Piotr Jedrzejowicz
2009PAAMSAgent-Based Approach to the Dynamic Vehicle Routing Problem.Dariusz Barbucha, Piotr Jedrzejowicz
2008ICAISCA Framework for Adaptive and Integrated Classification.Ireneusz Czarnowski, Piotr Jedrzejowicz
2008ICCSWeb Accessible A-Team Middleware.Dariusz Barbucha, Ireneusz Czarnowski, Piotr Jedrzejowicz, Ewa Ratajczak-Ropel, Izabela Wierzbowska
2008KESA Cross-Entropy Based Population Learning Algorithm for Discrete-Continuous Scheduling with Continuous Resource Discretisation.Piotr Jedrzejowicz, Aleksander Skakovski
2007KESAn Investigation of Agent-Based Hybrid Approach to Solve Flowshop and Job-Shop Scheduling Problems.Joanna Jedrzejowicz, Piotr Jedrzejowicz
2007SGAIAn Agent-Based Algorithm for Data Reduction.Ireneusz Czarnowski, Piotr Jedrzejowicz
2006ICCSJADE-Based A-Team Environment.Piotr Jedrzejowicz, Izabela Wierzbowska
2006ISDAJADE-Based A-Team as a Tool for Implementing Population-Based Algorithms.Dariusz Barbucha, Ireneusz Czarnowski, Piotr Jedrzejowicz, Ewa Ratajczak, Izabela Wierzbowska
2006ISDAA Population Learning Algorithm for Discrete-Continuous Scheduling with Continuous Resource Discretisation.Piotr Jedrzejowicz, Aleksander Skakovski
2006SGAIAn Agent-Based Approach to Non-Distributed and Distributed Clustering.Ireneusz Czarnowski, Piotr Jedrzejowicz
2005ICANNAn Agent-Based PLA for the Cascade Correlation Learning Architecture.Ireneusz Czarnowski, Piotr Jedrzejowicz
2005SGAIAn Agent-Based Approach to ANN Training.Ireneusz Czarnowski, Piotr Jedrzejowicz
2004ICAISCProbability Distribution of Solution Time in ANN Training Using Population Learning Algorithm.Ireneusz Czarnowski, Piotr Jedrzejowicz
2003KESPopulation-Based Approach to Multiprocessor Task Scheduling in Multistage Hybrid Flowshops.Joanna Jedrzejowicz, Piotr Jedrzejowicz
2003SGAIAn Approach to Instance Reduction in Supervised Learning.Ireneusz Czarnowski, Piotr Jedrzejowicz
2002HISExperimental Evaluation of the PLA-Based Permutation-Scheduling.Joanna Jedrzejowicz, Piotr Jedrzejowicz
1999PDPTAOnline Scheduling of the Multiple Variant Programs - Competitiveness Analysis.Piotr Jedrzejowicz, I. Wierzbowsba
1999SAFECOMPScheduling Fault-Tolerant Programs on Multiple Processors to Maximize Schedule Reliability.Ireneusz Czarnowski, Piotr Jedrzejowicz, Ewa Ratajczak
1993ISSRETesting and reliability of logic programs.Alireza Azem, Fevzi Belli, Oliver Jack, Piotr Jedrzejowicz
1991ISSREComparative analysis of concurrent fault tolerance techniques for real-time applications.Fevzi Belli, Piotr Jedrzejowicz
1988GIFEUEX - Ein Expertensystem zur Beratung ber Gefahrguttransport und fr den Feuerwehreinsatz.Fevzi Belli, Hinrich E. G. Bonin, W. Filipowicz, Piotr Jedrzejowicz