Skip to content

Reha Uzsoy

Publication record assembled from the DBLP archive of ranked conferences.

Papers indexed

27

Venues

1

Active years

2000–2025

Best venue rank

National

Where they publish

Papers

27 indexed papers, newest first.

YearVenueTitleAuthors
2025WSCShaping Tomorrow's Factories: A Panel on Simulation-Driven Manufacturing.Alp Akcay, Christoph Laroque, Robert J. Rencher, Guodong Shao, Reha Uzsoy, Nienke Valkhoff
2023WSCDecentralized Decision-Making Framework for Managing Product Rollovers in the Semiconductor Manufacturing.Carlos Leca, Reha Uzsoy, Karl G. Kempf
2022WSCTowards Decentralized Decisions for Managing Product Transitions in Semiconductor Manufacturing.Carlos Leca, Edward P. Fitts, Karl G. Kempf, Reha Uzsoy
2022WSCImpact of Production Planning Approaches on Wafer Fab Performance During Product Mix Changes.Tobias Vlker, Lars Mnch, Reha Uzsoy
2021WSCAn Optimization Framework for Managing Product Transitions in Semiconductor Manufacturing.Carlos Leca, Karl G. Kempf, Reha Uzsoy
2020WSCA Simulation Optimization Approach for Managing Product Transitions in Multistage Production Lines.Atchyuta Bharadwaj Manda, Karthick Gopalswamy, Sara Shashaani, Reha Uzsoy
2019WSCA Robust Optimization Approach for Production Planning Under Exogenous Planned Lead Times.Erin Albey, Ihsan Yanikoglu, Reha Uzsoy
2019WSCEvaluating Mixed Integer Programming Models for Solving Stochastic Inventory Problems.Bas Bluemink, A. G. de Kok, Srinivasan Balan, Reha Uzsoy
2019WSCOptimzing Engineering and Production Lots During Product Transitions in Semiconductor Manufacturing.Atchyuta Bharadwaj Manda, Reha Uzsoy
2018WSCAn Exploratory Comparison of Clearing function and Data-Driven production Planning Models.Karthick Gopalswamy, Reha Uzsoy
2018WSCSimulation Optimization for Planning Product Transitions in semiconductor manufacturing Facilities.Atchyuta Bharadwaj Manda, Reha Uzsoy
2017WSCLoad dependent lead time modelling: A robust optimization approach.Erin Albey, Ihsan Yanikoglu, Reha Uzsoy
2017WSCAn iterative refinement approach to fitting clearing functions to data from simulation models of production systems.Karthick Gopalswamy, Reha Uzsoy
2016WSCA chance constraint based multi-item production planning model using simulation optimization.Erin Albey, Reha Uzsoy, Karl G. Kempf
2016WSCModeling the impact of new product introduction on the output of semiconductor wafer fabrication facilities.Atchyuta Bharadwaj Manda, Reha Uzsoy, Karl G. Kempf, Sukgon Kim
2015WSCLead time modeling in production planning.Erin Albey, Reha Uzsoy
2015WSCSimulation-based performance assessment of production planning formulations for semiconductor wafer fabrication.Timm Ziarnetzky, Necip Baris Kacar, Lars Mnch, Reha Uzsoy
2014WSC(Almost) present at the creation: 25 years of modelling and simulation in semiconductor manufacturing.Reha Uzsoy
2013WSCA comparison of production planning formulations with exogenous cycle time estimates using a large-scale wafer fab model.Necip Baris Kacar, Lars Mnch, Reha Uzsoy
2011WSCProduction planning for semiconductor manufacturing via simulation optimization.Jingang Liu, Chihui Li, Feng Yang, Hong Wan, Reha Uzsoy
2010WSCEstimating clearing functions from simulation data.Necip Baris Kacar, Reha Uzsoy
2010WSCModelling the response of a public health department to infectious disease.Travis Worth, Reha Uzsoy, Erika Samoff, Anne-Marie Meyer, Jean-Marie Maillard, Aaron M. Wendelboe
2008WSCModeling and analysis of semiconductor manufacturing in a shrinking world: Challenges and successes.Chen-Fu Chien, Stphane Dauzre-Prs, Hans Ehm, John W. Fowler, Zhibin Jiang, Shekar Krishnaswamy, Lars Mnch, Reha Uzsoy
2008WSCAn experimental study of an iterative simulation-optimization algorithm for production planning.Durmus Fatih Irdem, Necip Baris Kacar, Reha Uzsoy
2007WSCDetermining safety stocks in the presence of workload-dependent lead times.Seza Orun, Sila etinkaya, Reha Uzsoy
2006WSCUsing system dynamics simulations to compare capacity models for production planning.Seza Orun, Reha Uzsoy, Karl G. Kempf
2000WSCAlternative loading and dispatching policies for furnace operations in semiconductor manufacturing: a comparison by simulation.Elif Akali, Reha Uzsoy, David G. Hiscock, Anne L. Moser, Timothy J. Teyner