| 2024 | WSC | A Federated Simulation-Based Framework for Enhanced Construction Project Planning and Control. | Rana Ead, Stephen Hague, Yasser Mohamed, Simaan M. AbouRizk |
| 2024 | WSC | A Framework of Project Risk Simulation with Event Knowledge Graph. | He Wen, Simaan M. AbouRizk, Yasser Mohamed, Rongbing Huang |
| 2022 | WSC | Using Simulation-Based Forecasting to Project Singapore's Future Residential Construction Demand and Impacts on Sustainability. | Elyar Pourrahimian, Malak Al Hattab, Salam Khalife, Mohamed El-Menshawy, Simaan M. AbouRizk |
| 2022 | WSC | System Dynamics Modeling of the Construction Supply Chain in Industrial Modularized Construction Projects. | Lingzi Wu, Simaan M. AbouRizk, Kunkun Li |
| 2021 | WSC | Dynamic, Data-Driven Simulation In Construction Using Advanced Metadata Structures and Bayesian Inference. | Ramzi Roy Labban, Stephen Hague, Elyar Pourrahimian, Simaan M. AbouRizk |
| 2021 | WSC | Enhanced Resource Scheduling Framework For Industrial Construction Projects. | Maedeh Taghaddos, Yasser Mohamed, Simaan M. AbouRizk, Hosein Taghaddos, Ulrich Hermann |
| 2020 | WSC | Planning and Scheduling Drainage Infrastructure Maintenance Operations Under Hard and Soft Constraints: A Simulation Study. | Monjurul Hasan, Ming Lu, Simaan M. AbouRizk, Jason Neufeld |
| 2020 | WSC | Automated Abstraction Of Operation Processes From Unstructured Text For Simulation Modeling. | Yitong Li, Wenying Ji, Simaan M. AbouRizk |
| 2020 | WSC | A Simulation-Based Decision-Support System for Reducing Duration, Cost, and Environmental Impacts of Earthmoving Operations. | Elyar Pourrahimian, Malak Al Hattab, Rana Ead, Ramzi Roy Labban, Simaan M. AbouRizk |
| 2019 | WSC | Using Combined Discrete-event/ Continuous Modeling for Simulation of Safety Incidents on Project Networks. | Rana Ead, Hady Elkholosy, Amira Eltahan, Stephen Hague, Simaan M. AbouRizk |
| 2019 | WSC | A Generic Simulation Model for Selecting Fleet Size in Snow Plowing Operations. | Yipeng Li, Shuoyan Xu, Lingzi Wu, Simaan M. AbouRizk, Tae J. Kwon, Zhen Lei |
| 2018 | WSC | Improving tunneling simulation using Bayesian Updating and Hidden Markov Chains. | Michael Werner, Wenying Ji, Simaan M. AbouRizk |
| 2017 | WSC | Data-driven simulation-based model for planning roadway operation and maintenance projects. | Emad Mohamed, Parinaz Jafari, Ming-Fung Francis Siu, Simaan M. AbouRizk |
| 2016 | WSC | A prototype for simulating the kinematics of crane rigging oscillatory motion using Simphony.NET. | Ronald Ekyalimpa, Martin Akolo Chiteri, Simaan M. AbouRizk |
| 2016 | WSC | A combined discrete-continuous simulation model for analyzing train-pedestrian interactions. | Ronald Ekyalimpa, Michael Werner, Stephen Hague, Simaan M. AbouRizk, Nadia Porter |
| 2016 | WSC | Simulation-based analysis of operational efficiency and safety in a virtual environment. | Alireza Golabchi, SangUk Han, Simaan M. AbouRizk, Jim Kanerva |
| 2016 | WSC | A Bayesian inference based simulation approach for estimating fraction nonconforming of pipe spool welding processes. | Wenying Ji, Simaan M. AbouRizk |
| 2015 | WSC | Simulation based multi-objective cost-time trade-off for multi-family residential off-site construction. | Samer Bu Hamdan, Aladdin Alwisy, Mohamed Al-Hussein, Simaan M. AbouRizk, Ziad Ajweh |
| 2015 | WSC | Simulation case study: modelling distinct breakdown events for a tunnel boring machine excavation. | Michael Werner, Simaan M. AbouRizk |
| 2015 | WSC | How to protect adjacent bridges due to tunnel excavation: a case study. | Limao Zhang, Simaan M. AbouRizk, Xianguo Wu |
| 2015 | WSC | Updating geological conditions using bayes theorem and markov chain. | Limao Zhang, Ronald Ekyalimpa, Stephen Hague, Michael Werner, Simaan M. AbouRizk |
| 2014 | WSC | Material and facility layout planning in construction projects using simulation. | Pejman Alanjari, SeyedReza RazaviAlavi, Simaan M. AbouRizk |
| 2014 | WSC | BIM-based data mining approach to estimating job man-hour requirements in structural steel fabrication. | Xiaolin Hu, Ming Lu, Simaan M. AbouRizk |
| 2014 | WSC | Bi-level project simulation methodology to integrate superintendent and project manager in decision making: shutdown/turnaround applications. | Ming-Fung Francis Siu, Ming Lu, Simaan M. AbouRizk |
| 2013 | WSC | A discrete event simulation model of asphalt paving operations. | Ramzi Labban, Simaan M. AbouRizk, Zuhair Haddad, Amr Elsersy |
| 2013 | WSC | Utilizing simulation derived quantitative formulas for accurate excavator hauler fleet selection. | David Morley, Ming Lu, Simaan M. AbouRizk |
| 2012 | WSC | Effective strategies for simulating one-of-a-kind construction projects. | Ronald Ekyalimpa, Simaan M. AbouRizk, Jack Farrar |
| 2012 | WSC | Simulation of mobile falsework utilization methods in bridge construction. | Hexu Liu, Ming-Fung Francis Siu, Ronald Ekyalimpa, Ming Lu, Simaan M. AbouRizk, Sebastian Hollermann, Hans-Joachim Bargstdt |
| 2011 | WSC | Analyzing transit tunnel construction strategies using discrete event simulation. | Elmira Moghani, Hala AbouRizk, Simaan M. AbouRizk, Heiner Sander |
| 2011 | WSC | Integrating realtime project progress input into a construction simulation model. | Hua Xie, Simaan M. AbouRizk, Siri Fernando |
| 2010 | WSC | An HLA-based bidding game with intelligent virtual player. | Simaan M. AbouRizk, Stephen Hague, Yasser Mohamed, Aminah Robinson Fayek |
| 2010 | WSC | Developing complex distributed simulation for industrial plant construction using High Level Architecture. | Simaan M. AbouRizk, Yasser Mohamed, Hosein Taghaddos, Farzaneh Saba, Stephen Hague |
| 2010 | WSC | 3D CAD modeling and visualization of the tunnel construction process in a distributed simulation environment. | Yang Zhang, Elmira Moghani, Simaan M. AbouRizk, Siri Fernando |
| 2009 | WSC | An Overview of the COSYE Environment for Construction Simulation. | Simaan M. AbouRizk, Stephen Hague |
| 2009 | WSC | Meaningful Level of Change in Hybrid Simulation for Construction Analysis. | Amin Alvanchi, SangHyun Lee, Simaan M. AbouRizk |
| 2008 | WSC | Distributed agent-based simulation of construction projects with HLA. | Hosein Taghaddos, Simaan M. AbouRizk, Yasser Mohamed, Ivan Ourdev |
| 2008 | WSC | A simulation template for modeling tunnel shaft construction. | Fangyi Zhou, Simaan M. AbouRizk, Siri Fernando |
| 2007 | WSC | Qualitative simulation of construction performance using fuzzy cognitive maps. | Manjula Dissanayake, Simaan M. AbouRizk |
| 2007 | WSC | Simulation and uncertainty modeling of project schedules estimates. | Ivan Ourdev, Simaan M. AbouRizk, Mohammed Al-Bataineh |
| 2007 | WSC | A simulation-based framework for quantifying the cold regions weather impacts on construction schedules. | Adham Shahin, Simaan M. AbouRizk, Yasser Mohamed, Siri Fernando |
| 2006 | WSC | Productivity simulation during the planning phase of the Glencoe tunnel in Calgary, Canada: a case study. | Hussien T. Al-Battaineh, Simaan M. AbouRizk, James Tan, Siri Fernando |
| 2005 | WSC | Modeling scheduling uncertainty in capital construction projects. | Nathan D. Boskers, Simaan M. AbouRizk |
| 2004 | WSC | Simulation Input Updating Using Bayesian Techniques. | Tae Hwan Chung, Yasser Mohamed, Simaan M. AbouRizk |
| 2003 | WSC | Construction engineering and project management II: an application of lean concepts and simulation for drainage operations maintenance crews. | Albert Agbulos, Simaan M. AbouRizk |
| 2003 | WSC | Construction engineering and project management I: building a virtual shop model for steel fabrication. | Lingguang Song, Simaan M. AbouRizk |
| 2002 | WSC | CEPM 1: optimal construction project planning. | Simaan M. AbouRizk, Yasser Mohamed |
| 2002 | WSC | CEPM 1: special purpose simulation modeling of tower cranes. | Bradford J. A. Appleton, John Patra, Yasser Mohamed, Simaan M. AbouRizk |
| 2001 | WSC | Design, development and application of soil transition algorithms for tunneling using special purpose simulation. | Janaka Y. Ruwanpura, Simaan M. AbouRizk |
| 2000 | WSC | Simphony: an integrated environment for construction simulation. | Simaan M. AbouRizk, Yasser Mohamed |
| 1999 | WSC | Special purpose simulation template for utility tunnel construction. | Simaan M. AbouRizk, Janaka Y. Ruwanpura, K. C. Er, Siri Fernando |
| 1999 | WSC | Simphony: an environment for building special purpose construction simulation tools. | Dany Hajjar, Simaan M. AbouRizk |
| 1999 | WSC | Application of simulation in trenchless renewal of underground urban infrastructure. | Jason S. Lueke, Samuel T. Ariaratnam, Simaan M. AbouRizk |
| 1999 | WSC | Product-based model representation for integrating 3D CAD with computer simulation. | Jianfei Xu, Simaan M. AbouRizk |
| 1998 | WSC | Integrating Neural Networks with Special Purpose Simulation. | Dany Hajjar, Simaan M. AbouRizk, Kevin Mather |
| 1997 | WSC | AP2-Earth: A Simulation Based System for the Estimating and Planning of Earth Moving Operations. | Dany Hajjar, Simaan M. AbouRizk |
| 1996 | WSC | Building a special purposes simulation tool for earth moving operations. | Dany Hajjar, Simaan M. AbouRizk |
| 1995 | WSC | Automating the Process of Building Simulation Models. | Simaan M. AbouRizk, Jingsheng Shi, Brenda McCabe, Dany Hajjar |
| 1995 | WSC | Applications of Simulation in Progress Reporting and Control. | Nader N. Chehayeb, Simaan M. AbouRizk |
| 1994 | WSC | AP | Anil Sawhney, Simaan M. AbouRizk |
| 1994 | WSC | A resource based simulation approach with application in earthmoving/strip mining. | Jingsheng Shi, Simaan M. AbouRizk |
| 1992 | WSC | State of the Art in Construction Simulation. | Simaan M. AbouRizk, Daniel W. Halpin, James D. Lutz |