| 2024 | KES | Resolving a Hybrid Flow Shop Problem with Dedicated Machines: Incorporating Blocking and Release Date Constraints. | Zouhour Nabli, Soulef Khalfallah, Ouajdi Korbaa |
| 2022 | ISDA | A Decision Support System Based Vehicle Ontology for Solving VRPs. | Syrine Belguith, Soulef Khalfallah, Ouajdi Korbaa |
| 2021 | SoMeT | An Ontology for Modeling Vehicle Routing Problems. | Syrine Belguith, Soulef Khalfallah, Ouajdi Korbaa |
| 2020 | KES | Tabu-search optimization approach for no-wait hybrid flow-shop scheduling with dedicated machines. | Houda Harbaoui, Soulef Khalfallah |
| 2018 | KES | A two-stage hybrid flow shop problem with dedicated machine and release date. | Zouhour Nabli, Soulef Khalfallah, Ouajdi Korbaa |
| 2017 | ISDA | A Novel Hybrid GA for the Assignment of Jobs to Machines in a Complex Hybrid Flow Shop Problem. | Houda Harbaoui, Soulef Khalfallah, Odile Bellenguez-Morineau |
| 2017 | ISDA | Heuristics for the Hybrid Flow Shop Scheduling Problem with Parallel Machines at the First Stage and Two Dedicated Machines at the Second Stage. | Zouhour Nabli, Soulef Khalfallah, Ouajdi Korbaa |
| 2017 | SISY | A case study of a hybrid flow shop with no-wait and limited idle time to minimize material waste. | Houda Harbaoui, Soulef Khalfallah, Odile Bellenguez-Morineau |
| 2016 | SMC | Scheduling a two-stage hybrid flow shop with dedicated machines, time lags and sequence-dependent family setup times. | Houda Harbaoui, Odile Bellenguez-Morineau, Soulef Khalfallah |
| 2016 | SMC | Mathematical programming formulations for hybrid flow shop scheduling with parallel machines at the first stage and two dedicated machines at the second stage. | Zouhour Nabli, Ouajdi Korbaa, Soulef Khalfallah |