| 2026 | ECMS | Hierarchical Production Planning For Supply Chain Resilience: A Simulation-Based Approach. | Chenghao Dai, Maximilian Schoen, Frank Herrmann, Thorsten Claus |
| 2025 | ECMS | Review: Multi-Robot Task Allocation With Battery Management Constraints In Intralogistics. | Maximilian Dilefeld, Thorsten Claus, Frank Herrmann, Enrico Teich |
| 2025 | ECMS | Developing An Automated Approach Of Risk Analysis In Supply Chains Using AI. | Janis Purk, Franz Vallee, Thorsten Claus, Frank Herrmann |
| 2025 | ECMS | Resilient Multi-Site Aggregate Production Planning: A Stochastic Model. | Maximilian Schoen, Chenghao Dai, Frank Herrmann, Thorsten Claus |
| 2024 | ECMS | Multi-Site Aggregate Production Planning With Resilience Considerations. | Chenghao Dai, Maximilian Schoen, Thorsten Claus, Frank Herrmann |
| 2024 | ECMS | Robot Task Assignment In Dynamic Factory Environments. | Maximilian Dilefeld, Thorsten Claus, Frank Herrmann, Enrico Teich |
| 2023 | ECMS | Established Production Planning And Control And Its Enhancement With Sustainability. | Marco Trost, Hajo Terbrack, Thorsten Claus, Frank Herrmann |
| 2022 | ECMS | Emission Reduction Through Production Scheduling By Priority Rules And Energy Onsite Generation. | Hajo Terbrack, Thorsten Claus, Frank Herrmann |
| 2021 | ECMS | Employment Of Temporary Workers And Use Of Overtime To Achieve Volume Flexibility Using Master Production Scheduling: Monetary And Social Implications. | Marco Trost, Thorsten Claus, Frank Herrmann |
| 2020 | ECMS | Deviation In Energy Consumption On Aggregate Production Planning Level In Industrial Practice. | Hajo Terbrack, Thorsten Claus, Frank Herrmann |
| 2020 | ECMS | Influence Of Company Sizes In Adapted Master Production Scheduling For Improving Human Working Conditions. | Marco Trost, Thorsten Claus, Frank Herrmann |
| 2019 | ECMS | Adapted Master Production Scheduling: Potential For Improving Human Working Conditions. | Marco Trost, Thorsten Claus, Frank Herrmann |
| 2019 | ECMS | Sustainable Production Planning And Control: A Systematic Literature Review. | Marco Trost, Robert Forstner, Thorsten Claus, Frank Herrmann, Ingo Frank, Hajo Terbrack |
| 2016 | ECMS | Job Shop Scheduling With Flexible Energy Prices. | Maximilian Selmair, Thorsten Claus, Marco Trost, Andreas Bley, Frank Herrmann |
| 2016 | ECMS | Social And Ecological Capabilities For A Sustainable Hierarchical Production Planning. | Marco Trost, Thorsten Claus, Enrico Teich, Maximilian Selmair, Frank Herrmann |
| 2013 | ECMS | Simulation Of Robust Master Production Scheduling In An Industrially Relevant Planning Environment. | Julian Englberger, Frank Herrmann, Thorsten Claus |
| 2013 | ECMS | Simulation Based Clearing Functions For A Model Of Order Release Planning. | Frederick Lange, Frank Herrmann, Thorsten Claus |