| 2023 | WSC | Backward Simulation: A Customer-Focused Diversification of Fab Simulation Applications in a Highly Automated Semiconductor Production Line. | Wolfgang Scholl, Patrick Preuss, Christoph Laroque, Madlene Leiau |
| 2021 | WSC | Backward Simulation for Production Planning - Recent Advances in a Real-World Use-Case. | Christoph Laroque, Madlene Leiau, Wolfgang Scholl, Germar Schneider |
| 2021 | WSC | Simulation Model Simplification For Changing Product Mix Scenario. | Igor Stogniy, Wolfgang Scholl, Hans Ehm |
| 2020 | WSC | Challenges Associated with Realization of Lot Level Fab Out Forecast in a Giga Wafer Fabrication Plant. | Georg Seidel, Ching Foong Lee, Aik Ying Tang, Soo Leen Low, Boon Ping Gan, Wolfgang Scholl |
| 2020 | WSC | Using Accuracy Measurements to Evaluate Simulation Model Simplification. | Igor Stogniy, Wolfgang Scholl |
| 2019 | WSC | Using Delays for Process flow Simplification. | Igor Stogniy, Wolfgang Scholl |
| 2018 | WSC | Bridging the Gap between fab simulation and supply Chain Forecast. | Wolfgang Scholl, Matthias Forster, Patrick Preuss, Andr Naumann, Hui Ping Ooi, Boon-Ping Gan |
| 2016 | WSC | Simulation-enabled development lot journey smoothening in a fully-utilised semiconductor manufacturing line. | Wolfgang Scholl, Matthias Forster, Patrick Preuss, Andr Naumann, Boon-Ping Gan, Peter Lendermann |
| 2014 | WSC | Enhancement of simulation-based semiconductor manufacturing forecast quality through hybrid tool down time modeling. | Patrick Preuss, Andr Naumann, Wolfgang Scholl, Boon-Ping Gan, Peter Lendermann |
| 2014 | WSC | Evaluations on scheduling in semiconductor manufacturing by backward simulation. | Wolfgang Scholl, Christoph Laroque, Gerald Weigert |
| 2013 | WSC | Automatic model verification for semiconductor manufacturing simulation. | Boon-Ping Gan, Peter Lendermann, Wolfgang Scholl, Marcin Mosinski, Patrick Preuss |
| 2012 | WSC | A multi-stage discrete event simulation approach for scheduling of maintenance activities in a semiconductor manufacturing line. | Wolfgang Scholl, Marcin Mosinski, Boon-Ping Gan, Peter Lendermann, Patrick Preuss, Daniel Noack |
| 2011 | WSC | Cluster based analytical method for the lot delivery forecast in semiconductor fab with wide product range. | Marcin Mosinski, Daniel Noack, Falk Stefan Pappert, Oliver Rose, Wolfgang Scholl |
| 2011 | WSC | Challenges and solution approaches for the online simulation of semiconductor wafer fabs. | Daniel Noack, Marcin Mosinski, Oliver Rose, Peter Lendermann, Boon-Ping Gan, Wolfgang Scholl |
| 2011 | WSC | Implementation of a simulation-based short-term lot arrival forecast in a mature 200mm semiconductor fab. | Wolfgang Scholl, Daniel Noack, Oliver Rose, Boon-Ping Gan, Peter Lendermann, Patrick Preuss, Falk Stefan Pappert |
| 2010 | WSC | Towards realization of a high-fidelity simulation model for short-term horizon forecasting in wafer fabrication facilities. | Wolfgang Scholl, Boon-Ping Gan, Ming Li Peh, Peter Lendermann, Daniel Noack, Oliver Rose, Patrick Preuss |
| 2008 | WSC | Coping with typical unpredictable incidents in a logic fab. | Wolfgang Scholl |