Skip to content

A heuristic simulation-based framework to improve the scheduling of blocks assembly and the production process in shipbuilding.

Natalia P. Basn, Victoria G. Achkar, Carlos A. Mndez, Alejandro Garcia del Valle

Year2017
ProceedingsWSC

Browse the full WSC paper archive.