Skip to content

Appa Iyer Sivakumar

Publication record assembled from the DBLP archive of ranked conferences.

Papers indexed

17

Venues

1

Active years

1999–2013

Best venue rank

National

Where they publish

Papers

17 indexed papers, newest first.

YearVenueTitleAuthors
2013WSCA simulation based analysis on reducing patient waiting time for consultation in an outpatient eye clinic.Xianfei Jin, Appa Iyer Sivakumar, Sing Yong Lim
2008WSCSimulation analysis of cluster tool operations in wafer fabrication.Amit Kumar Gupta, Peter Lendermann, Appa Iyer Sivakumar, John Priyadi
2008WSCExperimental study on variations of WIPLOAD Control in semiconductor wafer fabrication environment.Appa Iyer Sivakumar, Chao Qi, Andy Darwin Kasan Hidayat
2008WSCOnline control of a batch processor with incompatible job families under correlated future arrivals.John Benedict C. Tajan, Appa Iyer Sivakumar, Stanley B. Gershwin
2007WSCOnline multiobjective single machine dynamic scheduling with sequence-dependent setups using simulation-based genetic algorithm with desirability function.Adeline T. H. Ang, Appa Iyer Sivakumar
2007WSCSimulation experimental investigation on job release control in semiconductor wafer fabrication.Chao Qi, Appa Iyer Sivakumar, Stanley B. Gershwin
2006WSCA bee colony optimization algorithm to job shop scheduling.Chin Soon Chong, Appa Iyer Sivakumar, Malcolm Yoke Hean Low, Kheng Leng Gay
2006WSCPareto control in multi-objective dynamic scheduling of a stepper machine in semiconductor wafer fabrication.Amit Kumar Gupta, Appa Iyer Sivakumar
2005WSCUsing simulation based approach to improve on the mean cycle time performance of dispatching rules.Chin Soon Chong, Malcolm Y. H. Low, Appa Iyer Sivakumar, Kheng Leng Gay
2003WSCFactory scheduling: simulation based scheduling using a two-pass approach.Chin Soon Chong, Appa Iyer Sivakumar, Robert K. L. Gay
2003WSCDynamic scheduling I: simulation-based scheduling for dynamic discrete manufacturing.Chin Soon Chong, Appa Iyer Sivakumar, Robert K. L. Gay
2002WSCSemiconductor manufacturing: design, development and application of an object oriented simulation toolkit for real-time semiconductor manufacturing scheduling.Chin Soon Chong, Appa Iyer Sivakumar, Robert K. L. Gay
2002WSCSemiconductor manufacturing: simulation based multiobjective schedule optimization in semiconductor manufacturing.Amit K. Gupta II, Appa Iyer Sivakumar
2002WSCScheduling & control: shop floor scheduling with simulation based proactive decision support.Amit K. Gupta II, Appa Iyer Sivakumar, Sumit Sarawgi
2002WSCModeling methodology: simulation based cause and effect analysis of cycle time and WIP in semiconductor wafer fabrication.Chao Qi, Tuck Keat Tang, Appa Iyer Sivakumar
2000WSCSimulation based cause and effect analysis of cycle time distribution in semiconductor backend.Appa Iyer Sivakumar
1999WSCOptimization of a cycle time and utilization in semiconductor test manufacturing using simulation based, on-line, near-real-time scheduling system.Appa Iyer Sivakumar