| 2022 | CoDIT | Comparison Between Model-Based and Data-Based Methods for Fault Diagnosis of Railway Turnouts. | Asma Ladj, Belkacem Ould Bouamama, Armand Toguyni |
| 2019 | CoDIT | Collisions avoidance and deadlocks prevention, for dynamic routing of trains in a railway node. | Paul Cazenave, Manel Khlif-Bouassida, Armand Toguyni |
| 2016 | ECSA | Formal Verification of Software-Intensive Systems Architectures Described with Piping and Instrumentation Diagrams. | Soraya Mesli-Kesraoui, Djamal Kesraoui, Flvio Oquendo, Alain Bignon, Armand Toguyni, Pascal Berruet |
| 2010 | ICINCO | Patterns for Temporal Requirements Engineering - A Level Crossing Case Study. | Ahmed Mekki, Mohamed Ghazel, Armand Toguyni |
| 2010 | ICINCO | Timed Specification Patterns for System Validation: A Railway Case Study. | Ahmed Mekki, Mohamed Ghazel, Armand Toguyni |
| 2008 | ICSoft | Performance and Complexity Evaluation of Multi-Path Routing Algorithms for MPLS-TE. | Khodor Abboud, Armand Toguyni, Ahmed Rahmani |
| 2007 | SMC | A mathematical programming approach for the reconfiguration of reconfigurable manufacturing systems with token identification. | Sami Hadhri, Thomas Bourdeaud'huy, Armand Toguyni |
| 2006 | AINA | Hybrid Multipath Routing Algorithm for Load Balancing in MPLS Based IP Network. | Kyeongja Lee, Armand Toguyni, Ahmed Rahmani |
| 2006 | ETFA | Implementation of an Internet-controlled system under variable delays. | Alexandre Seuret, M. Termens-Ballester, Armand Toguyni, S. El Khattabi, Jean-Pierre Richard |
| 2004 | SMC | Towards an approach to automate reconfiguration procedure in automated production systems. | Abdallah Ghariani, Armand Toguyni, Etienne Craye |
| 2004 | SMC | Diagnosability of automated production systems using Petri net based models. | Larbi Sekhri, Armand Toguyni, Etienne Craye |