| 2025 | CoDIT | A Multi-Start Tabu Search with Set Partitioning for the Green VRP. | Atef Dridi, Dalila Tayachi, Aziz Moukrim, Lamjed Ben Said |
| 2023 | CoDIT | Scheduling in an Emergency Department, Linear Formulation and Heuristic Approach. | Lahcene Mezouari, Lucas Wicher, Jean-Paul Boufflet, Aziz Moukrim |
| 2018 | ATMOS | A Neighborhood Search and Set Cover Hybrid Heuristic for the Two-Echelon Vehicle Routing Problem. | Youcef Amarouche, Rym Nesrine Guibadj, Aziz Moukrim |
| 2017 | CoDIT | A branch-and-bound algorithm for the two-machine flow-shop problem with time delays. | Mohamed Amine Mkadem, Aziz Moukrim, Mehdi Serairi |
| 2014 | CoDIT | Branch and price with constraint propagation for Resource Constrained Project Scheduling Problem. | Aziz Moukrim, Alain Quilliot, Hlne Toussaint |
| 2014 | CPAIOR | New Lower Bounds on the Number of Vehicles for the Vehicle Routing Problem with Time Windows. | Sohaib Afifi, Rym Nesrine Guibadj, Aziz Moukrim |
| 2013 | CPAIOR | A Branch-and-Cut Algorithm for Solving the Team Orienteering Problem. | Duc-Cuong Dang, Racha El-Hajj, Aziz Moukrim |
| 2013 | FedCSIS | Branch and Price for Preemptive Resource Constrained Project Scheduling Problem Based on Interval Orders in Precedence Graphs. | Aziz Moukrim, Alain Quilliot, Hlne Toussaint |
| 2013 | FedCSIS | Branch and Price for Preemptive and Non Preemptive RCPSP Based on Interval Orders on Precedence Graphs. | Aziz Moukrim, Alain Quilliot, Hlne Toussaint |
| 2013 | SoCS | An Analysis Framework for Examination Timetabling. | Taha Arbaoui, Jean-Paul Boufflet, Aziz Moukrim |
| 2010 | IJCCI | Subgraph Extraction and Memetic Algorithm for the Maximum Clique Problem. | Duc-Cuong Dang, Aziz Moukrim |
| 2009 | ICINCO | Minimizing the Makespan in Two-machine Job Shop Scheduling Problems with no Machine Idle-time. | Fatma Herms, Jacques Carlier, Aziz Moukrim, Khaled Ghdira |
| 1999 | EuroPar | Scheduling with Communication Delays and On-Line Disturbances. | Aziz Moukrim, Eric Sanlaville, Frdric Guinand |