| 2025 | WSC | An Empirical Study on the Assessment of Demand Forecasting Reliability for Fabless Semiconductor Companies. | Inguk Choi, Seon-Young Hwang, Jeongsun Ahn, Je-Hun Lee, Sanghyun Joo, Kiung Kim, Haechan Lee, Yoong Song, Hyun-Jung Kim |
| 2025 | WSC | Graph-Based Reinforcement Learning for Dynamic Photolithography Scheduling. | Sang-Hyun Cho, Sohyun Jeong, Jimin Park, Boyoon Choi, Paul Han, Hyun-Jung Kim |
| 2024 | ICRA | Dynamic Crane Scheduling with Reinforcement Learning for a Steel Coil Warehouse. | Sang-Hyun Cho, Woo-Jin Shin, Jeongsun Ahn, Sanghyun Joo, Hyun-Jung Kim |
| 2024 | WSC | Reinforcement Learning for Unrelated Parallel Machine Scheduling with Release Dates, Setup Times, and Machine Eligibility. | Sang-Hyun Cho, Hyun-Jung Kim, Lars Mnch |
| 2023 | WSC | Semiconductor Equipment Health Monitoring With Multi-View Data. | Jeongsun Ahn, Hong-Yeon Kim, Sang-Hyun Cho, Hyun-Jung Kim, Hongyeon Kim, Hyeonjeong Choi, Dain Ham |
| 2022 | WSC | Monte Carlo Tree Search-Based Algorithm for Dynamic Job Shop Scheduling with Automated Guided Vehicles. | Duyeon Kim, Hyun-Jung Kim |
| 2022 | WSC | Imitation Learning for Real-Time Job Shop Scheduling Using Graph-Based Representation. | Je-Hun Lee, Hyun-Jung Kim |
| 2021 | WSC | Machine Learning-Based Periodic Setup Changes for Semiconductor Manufacturing Machines. | Je-Hun Lee, Hyun-Jung Kim, Young Kim, Yun Bae Kim, Byung-Hee Kim, Gu-Hwan Chung |
| 2020 | WSC | A Simulation-Based Sequential Search Method for Multi-Obejctive Scheduling Problems of Manufacturing Systems. | Je-Hun Lee, Young Kim, Yun Bae Kim, Byung-Hee Kim, Gu-Hwan Chung, Hyun-Jung Kim |
| 2019 | WSC | A Sequential Search Framework for Selecting Weights of Dispatching Rules in Manufacturing Systems. | Je-Hun Lee, Young Kim, Yun Bae Kim, Hyun-Jung Kim, Byung-Hee Kim, Gu-Hwan Chung |
| 2018 | ICRA | Completion Time Analysis for Automated Manufacturing Systems with Parallel Processing Modules. | Hyun-Jung Kim, Jun-Ho Lee |
| 2018 | WSC | A Framework for Performance Analysis of dispatching Rules in manufacturing Systems. | Je-Hun Lee, Young Kim, Jun Kim, Yun Bae Kim, Hyun-Jung Kim, Byung-Hee Kim, Gu-Hwan Chung |
| 2017 | CoDIT | Robot task sequencing for a flexible assembly system with 3D printers. | Hyun-Jung Kim, Jun-Ho Lee |
| 2017 | WSC | Rescheduling of flexible flow shop with sequence-dependent setup times and job splitting. | Jun Kim, Je-Hun Lee, Seong-Lak Choi, Hyun-Jin Jung, Yun Bae Kim, Hyun-Jung Kim, Byung-Hee Kim, Gu-Hwan Chung |
| 2015 | WSC | Makespan computation of lot switching period in single-armed cluster tools. | Hyun-Jung Kim, Jun-Ho Lee |
| 2013 | WSC | Two-stage lot scheduling with waiting time constraints and due dates. | Tae-Sun Yu, Hyun-Jung Kim, Chanhwi Jung, Tae-Eog Lee |
| 2012 | SMC | A petri net-based modeling and scheduling with a branch and bound algorithm. | Hyun-Jung Kim, Jun-Ho Lee, Tae-Eog Lee |
| 2012 | SMC | Scheduling a wet station using a branch and bound algorithm. | Hyun-Jung Kim, Jun-Ho Lee, Tae-Eog Lee |