| 2023 | WSC | Decentralized Decision-Making Framework for Managing Product Rollovers in the Semiconductor Manufacturing. | Carlos Leca, Reha Uzsoy, Karl G. Kempf |
| 2022 | WSC | Towards Decentralized Decisions for Managing Product Transitions in Semiconductor Manufacturing. | Carlos Leca, Edward P. Fitts, Karl G. Kempf, Reha Uzsoy |
| 2021 | WSC | An Optimization Framework for Managing Product Transitions in Semiconductor Manufacturing. | Carlos Leca, Karl G. Kempf, Reha Uzsoy |
| 2016 | WSC | A chance constraint based multi-item production planning model using simulation optimization. | Erin Albey, Reha Uzsoy, Karl G. Kempf |
| 2016 | WSC | Modeling the impact of new product introduction on the output of semiconductor wafer fabrication facilities. | Atchyuta Bharadwaj Manda, Reha Uzsoy, Karl G. Kempf, Sukgon Kim |
| 2012 | WSC | Simulation-based multi-mode resource-constrained project scheduling of semiconductor equipment installation and qualification. | Junzilan Cheng, John W. Fowler, Karl G. Kempf |
| 2007 | WSC | Application of combined discrete-event simulation and optimization models in semiconductor enterprise manufacturing systems. | Gary W. Godding, Hessam S. Sarjoughian, Karl G. Kempf |
| 2006 | WSC | Flexible experimentation and analysis for hybrid DEVS and MPC models. | Dongping Huang, Hessam S. Sarjoughian, Gary W. Godding, Daniel E. Rivera, Karl G. Kempf |
| 2006 | WSC | Using system dynamics simulations to compare capacity models for production planning. | Seza Orun, Reha Uzsoy, Karl G. Kempf |
| 2005 | WSC | Hybrid discrete event simulation with model predictive control for semiconductor supply-chain manufacturing. | Hessam S. Sarjoughian, Dongping Huang, Gary W. Godding, Karl G. Kempf, Wenlin Wang, Daniel E. Rivera, Hans D. Mittelmann |
| 2004 | WSC | Multi-Formalism Modeling Approach for Semiconductor Supply/Demand Networks. | Gary W. Godding, Hessam S. Sarjoughian, Karl G. Kempf |
| 2003 | WSC | Supply chain and distribution network: semiconductor supply network simulation. | Gary W. Godding, Hessam S. Sarjoughian, Karl G. Kempf |
| 1996 | WSC | Simulating Semiconductor Manufacturing Systems: Successes, Failures, and Deep Questions. | Karl G. Kempf |
| 1987 | ICRA | Reasoning about opportunistic schedules. | B. R. Fox, Karl G. Kempf |
| 1986 | AAAI | Designing for Manufacturability in Riveted Joints. | A. R. Kilhoffer, Karl G. Kempf |
| 1986 | ICRA | A collision detection algorithm based on velocity and distance bounds. | R. K. Culley, Karl G. Kempf |
| 1986 | UAI | Planning, scheduling and uncertainty in the sequence of future events. | B. R. Fox, Karl G. Kempf |
| 1986 | UAI | Evaulation of uncertain inference models I: PROSPECTOR. | Robert M. Yadrick, Bruce M. Perrin, David S. Vaughan, Peter D. Holden, Karl G. Kempf |
| 1985 | ICRA | Opportunistic scheduling for robotic assembly. | B. R. Fox, Karl G. Kempf |
| 1985 | UAI | An Odds Ratio Based Inference Engine. | David S. Vaughan, Bruce M. Perrin, Robert M. Yadrick, Peter D. Holden, Karl G. Kempf |