Skip to content

Karl G. Kempf

Publication record assembled from the DBLP archive of ranked conferences.

Papers indexed

20

Venues

4

Active years

1985–2023

Best venue rank

A*

Where they publish

Papers

20 indexed papers, newest first.

YearVenueTitleAuthors
2023WSCDecentralized Decision-Making Framework for Managing Product Rollovers in the Semiconductor Manufacturing.Carlos Leca, Reha Uzsoy, Karl G. Kempf
2022WSCTowards Decentralized Decisions for Managing Product Transitions in Semiconductor Manufacturing.Carlos Leca, Edward P. Fitts, Karl G. Kempf, Reha Uzsoy
2021WSCAn Optimization Framework for Managing Product Transitions in Semiconductor Manufacturing.Carlos Leca, Karl G. Kempf, Reha Uzsoy
2016WSCA chance constraint based multi-item production planning model using simulation optimization.Erin Albey, Reha Uzsoy, Karl G. Kempf
2016WSCModeling the impact of new product introduction on the output of semiconductor wafer fabrication facilities.Atchyuta Bharadwaj Manda, Reha Uzsoy, Karl G. Kempf, Sukgon Kim
2012WSCSimulation-based multi-mode resource-constrained project scheduling of semiconductor equipment installation and qualification.Junzilan Cheng, John W. Fowler, Karl G. Kempf
2007WSCApplication of combined discrete-event simulation and optimization models in semiconductor enterprise manufacturing systems.Gary W. Godding, Hessam S. Sarjoughian, Karl G. Kempf
2006WSCFlexible experimentation and analysis for hybrid DEVS and MPC models.Dongping Huang, Hessam S. Sarjoughian, Gary W. Godding, Daniel E. Rivera, Karl G. Kempf
2006WSCUsing system dynamics simulations to compare capacity models for production planning.Seza Orun, Reha Uzsoy, Karl G. Kempf
2005WSCHybrid discrete event simulation with model predictive control for semiconductor supply-chain manufacturing.Hessam S. Sarjoughian, Dongping Huang, Gary W. Godding, Karl G. Kempf, Wenlin Wang, Daniel E. Rivera, Hans D. Mittelmann
2004WSCMulti-Formalism Modeling Approach for Semiconductor Supply/Demand Networks.Gary W. Godding, Hessam S. Sarjoughian, Karl G. Kempf
2003WSCSupply chain and distribution network: semiconductor supply network simulation.Gary W. Godding, Hessam S. Sarjoughian, Karl G. Kempf
1996WSCSimulating Semiconductor Manufacturing Systems: Successes, Failures, and Deep Questions.Karl G. Kempf
1987ICRAReasoning about opportunistic schedules.B. R. Fox, Karl G. Kempf
1986AAAIDesigning for Manufacturability in Riveted Joints.A. R. Kilhoffer, Karl G. Kempf
1986ICRAA collision detection algorithm based on velocity and distance bounds.R. K. Culley, Karl G. Kempf
1986UAIPlanning, scheduling and uncertainty in the sequence of future events.B. R. Fox, Karl G. Kempf
1986UAIEvaulation of uncertain inference models I: PROSPECTOR.Robert M. Yadrick, Bruce M. Perrin, David S. Vaughan, Peter D. Holden, Karl G. Kempf
1985ICRAOpportunistic scheduling for robotic assembly.B. R. Fox, Karl G. Kempf
1985UAIAn Odds Ratio Based Inference Engine.David S. Vaughan, Bruce M. Perrin, Robert M. Yadrick, Peter D. Holden, Karl G. Kempf