Skip to content

Markus Knig

Publication record assembled from the DBLP archive of ranked conferences.

Papers indexed

13

Venues

5

Active years

2012–2024

Best venue rank

National

Where they publish

Papers

13 indexed papers, newest first.

YearVenueTitleAuthors
2024ICARCVInside Bridges: Autonomous Crack Inspection with Nano UAVs in GNSS-Denied Environments.David Mller, Patrick Herbers, Raphael Dyrska, Firdes elik, Markus Knig, Martin Mnnigmann
2023ICMLARe-identification Robustness Over Time - The Case for Synthetic Training Data.Stephan Matzke, Christian Pionzewski, Jrme Rutinowski, Firdes elik, Markus Knig
2017WSCA scenario-based simulation framework of on- and off-site construction logistics.Ningshuang Zeng, Maximilian Dichtl, Markus Knig
2016WSCSimulation of automated construction using wire robots.Hannah Mattern, Tobias Bruckmann, Arnim Spengler, Markus Knig
2016WSCSimulation of maintenance strategies in mechanized tunneling.Markus Scheffer, Hannah Mattern, Markus Knig, Alena Conrads, Markus Thewes
2015IJCNNScalable real-time parking lot classification: An evaluation of image features and supervised learning algorithms.Marc Tschentscher, Christian Koch, Markus Knig, Jan Salmen, Marc Schlipsing
2014DATEReconfigurable silicon nanowire devices and circuits: Opportunities and challenges.Walter M. Weber, Jens Trommer, Matthias Grube, Andre Heinzig, Markus Knig, Thomas Mikolajick
2014WSCJobsite logistic simulation in mechanized tunneling.Markus Scheffer, Tobias Rahm, Ruben Duhme, Markus Thewes, Markus Knig
2013WSCModeling and simulating spatial requirements of construction activities.Arnim Marx, Markus Knig
2013WSCUncertainty modeling and simulation of tool wear in mechanized tunneling.Tobias Rahm, Ruben Duhme, Kambiz Sadri, Markus Thewes, Markus Knig
2012WSCIntelligent BIM-based construction scheduling using discrete event simulation.Markus Knig, Christian Koch, Ilka Habenicht, Sven Spieckermann
2012WSCAdvancement simulation of tunnel boring machines.Tobias Rahm, Kambiz Sadri, Christian Koch, Markus Thewes, Markus Knig
2012WSCAdjusted recombination operator for simulation-based construction schedule optimization.Kamil Szczesny, Matthias Hamm, Markus Knig