| 2023 | ICCS | Determination of the Lower Bounds of the Goal Function for a Single-Machine Scheduling Problem on D-Wave Quantum Annealer. | Wojciech Bozejko, Jaroslaw Pempera, Mariusz Uchronski, Mieczyslaw Wodecki |
| 2022 | ICCS | Distributed Quantum Annealing on D-Wave for the Single Machine Total Weighted Tardiness Scheduling Problem. | Wojciech Bozejko, Jaroslaw Pempera, Mariusz Uchronski, Mieczyslaw Wodecki |
| 2021 | ICCS | The Problem of Tasks Scheduling with Due Dates in a Flexible Multi-machine Production Cell. | Wojciech Bozejko, Piotr Nadybski, Pawel Rajba, Mieczyslaw Wodecki |
| 2021 | ICCS | A Job Shop Scheduling Problem with Due Dates Under Conditions of Uncertainty. | Wojciech Bozejko, Pawel Rajba, Mariusz Uchronski, Mieczyslaw Wodecki |
| 2020 | ICCS | Robust Single Machine Scheduling with Random Blocks in an Uncertain Environment. | Wojciech Bozejko, Pawel Rajba, Mieczyslaw Wodecki |
| 2019 | DEPCoS | Flow Shop Problem with Machine Time Couplings. | Wojciech Bozejko, Radoslaw Idzikowski, Mieczyslaw Wodecki |
| 2018 | DEPCoS | Meta-heuristic Task Scheduling Algorithm for Computing Cluster with 2D Packing Problem Approach. | Wojciech Bozejko, Zenon Chaczko, Piotr Nadybski, Mieczyslaw Wodecki |
| 2018 | DEPCoS | Robustness of the Uncertain Single Machine Total Weighted Tardiness Problem with Elimination Criteria Applied. | Wojciech Bozejko, Pawel Rajba, Mieczyslaw Wodecki |
| 2018 | DEPCoS | User Estimates Inaccuracy Study in HPC Scheduler. | Mariusz Uchronski, Wojciech Bozejko, Zdzislaw Krajewski, Mateusz Tykierko, Mieczyslaw Wodecki |
| 2017 | MMAR | Two level algorithm with Tabu Search optimization for task scheduling problem in computing cluster environment. | Wojciech Bozejko, Piotr Nadybski, Mieczyslaw Wodecki |
| 2017 | MMAR | Big valley in scheduling problems landscape - Metaheuristics with reduced searching area. | Wojciech Bozejko, Czeslaw Smutnicki, Mariusz Uchronski, Mieczyslaw Wodecki |
| 2016 | ICAISC | Tabu Search Algorithm with Neural Tabu Mechanism for the Cyclic Job Shop Problem. | Wojciech Bozejko, Andrzej Gnatowski, Teodor Nizynski, Mieczyslaw Wodecki |
| 2016 | ICAISC | Parallel Tabu Search Algorithm with Uncertain Data for the Flexible Job Shop Problem. | Wojciech Bozejko, Mariusz Uchronski, Mieczyslaw Wodecki |
| 2015 | ICAISC | Parallel Coevolutionary Algorithm for Three-Dimensional Bin Packing Problem. | Wojciech Bozejko, Lukasz Kacprzak, Mieczyslaw Wodecki |
| 2015 | ICAISC | Parallel Simulated Annealing Algorithm for Cyclic Flexible Job Shop Scheduling Problem. | Wojciech Bozejko, Jaroslaw Pempera, Mieczyslaw Wodecki |
| 2015 | ICAISC | Parallel Cost Function Determination on GPU for the Vehicle Routing Problem. | Mieczyslaw Wodecki, Wojciech Bozejko, Szymon Jagiello, Jaroslaw Pempera |
| 2015 | MMAR | Parallel packing procedure for three dimensional bin packing problem. | Wojciech Bozejko, Lukasz Kacprzak, Mieczyslaw Wodecki |
| 2014 | ICAISC | Solving Timetabling Problems on GPU. | Wojciech Bozejko, Lukasz Gniewkowski, Mieczyslaw Wodecki |
| 2014 | ICAISC | Scheduling Problem with Uncertain Parameters in Just in Time System. | Wojciech Bozejko, Pawel Rajba, Mieczyslaw Wodecki |
| 2014 | ICCS | Cyclic Hybrid Flow-shop Scheduling Problem with Machine Setups. | Wojciech Bozejko, Lukasz Gniewkowski, Jaroslaw Pempera, Mieczyslaw Wodecki |
| 2013 | ICAISC | Parallel Neuro-Tabu Search Algorithm for the Job Shop Scheduling Problem. | Wojciech Bozejko, Mariusz Uchronski, Mieczyslaw Wodecki |
| 2013 | PPAM | Multi-GPU Parallel Memetic Algorithm for Capacitated Vehicle Routing Problem. | Mieczyslaw Wodecki, Wojciech Bozejko, Michal Karpinski, Maciej Pacut |
| 2012 | ICAISC | Fast Parallel Cost Function Calculation for the Flow Shop Scheduling Problem. | Wojciech Bozejko, Mariusz Uchronski, Mieczyslaw Wodecki |
| 2012 | ICAISC | Solving the Flexible Job Shop Problem on GPU. | Wojciech Bozejko, Mariusz Uchronski, Mieczyslaw Wodecki |
| 2011 | ICAART | Single-walk Parallelization of the Genetic Algorithm. | Wojciech Bozejko, Mieczyslaw Wodecki |
| 2011 | ICAART | The Methodology of Parallel Memetic Algorithms Designing. | Wojciech Bozejko, Mieczyslaw Wodecki |
| 2011 | PPAM | Parallel Cost Function Determination on GPU for the Job Shop Scheduling Problem. | Wojciech Bozejko, Mariusz Uchronski, Mieczyslaw Wodecki |
| 2010 | ICAISC | Parallel Hybrid Metaheuristics for the Scheduling with Fuzzy Processing Times. | Wojciech Bozejko, Michal Czapinski, Mieczyslaw Wodecki |
| 2010 | ICAISC | Parallel Meta | Wojciech Bozejko, Mariusz Uchronski, Mieczyslaw Wodecki |
| 2008 | ICCS | Parallel Path-Relinking Method for the Flow Shop Scheduling Problem. | Wojciech Bozejko, Mieczyslaw Wodecki |
| 2007 | PPAM | Parallel Scatter Search Algorithm for the Flow Shop Sequencing Problem. | Wojciech Bozejko, Mieczyslaw Wodecki |
| 2006 | ICAISC | A New Inter-island Genetic Operator for Optimization Problems with Block Properties. | Wojciech Bozejko, Mieczyslaw Wodecki |
| 2005 | ISDA | A Hybrid Evolutionary Algorithm for some Discrete Optimization Problems. | Wojciech Bozejko, Mieczyslaw Wodecki |
| 2004 | ICAISC | Parallel Genetic Algorithm for Minimizing Total Weighted Completion Time. | Wojciech Bozejko, Mieczyslaw Wodecki |
| 2004 | ICAISC | The New Concepts in Parallel Simulated Annealing Method. | Wojciech Bozejko, Mieczyslaw Wodecki |
| 2003 | PPAM | Parallel Genetic Algorithm for the Flow Shop Scheduling Problem. | Wojciech Bozejko, Mieczyslaw Wodecki |
| 2001 | PPAM | Solving the Flow Shop Problem by Parallel Simulated Annealing. | Mieczyslaw Wodecki, Wojciech Bozejko |