| 2023 | WSC | Hybrid Approaches For Handling Mobile Crane Location Problems In Construction Sites. | Khaoula Boutouhami, Ahmed Bouferguene, Rafik Lemouchi, Mohamed Assaf, Mohamed Al-Hussein, Joe Kosa |
| 2020 | WSC | Deploying Discrete-Event Simulation and Continuous Improvement to Increase Production Rate in a Modular Construction Facility. | Fatima Alsakka, Salam Khalife, Mohammad Darwish, Mohamed Al-Hussein, Yasser Mohamed |
| 2019 | WSC | On-site Assembly of Modular Building Using Discrete Event Simulation. | Shuai Liu, Asif Mansoor, Brent Kugyelka, Ahmed Bouferguene, Mohamed Al-Hussein |
| 2018 | ICINCO | Design of a Saw Cutting Machine for Wood and Aluminum. | Jawad Ul Haq, Ahmed-Jawad Qureshi, Mohamed Al-Hussein |
| 2018 | WSC | Multi-Agent based simulation of Elderly Egress Process and Fall Accident in Senior Apartment Buildings. | Xiaojie Du, Yuan Chen, Ahmed Bouferguene, Mohamed Al-Hussein |
| 2016 | WSC | Heavy lift analysis at FEED stage for industrial project. | Zhen Lei, Mohamed Al-Hussein, Ulrich Hermann, Ahmed Bouferguene |
| 2015 | WSC | Online simulation modeling of prefabricated wall panel production using RFID system. | Mohammed Sadiq Altaf, Hexu Liu, Mohamed Al-Hussein, Haitao Yu |
| 2015 | WSC | Simulation based multi-objective cost-time trade-off for multi-family residential off-site construction. | Samer Bu Hamdan, Aladdin Alwisy, Mohamed Al-Hussein, Simaan M. AbouRizk, Ziad Ajweh |
| 2012 | WSC | Simulation of mobile crane operations in 3D space. | SangHyeok Han, Mohamed Al-Hussein, Shafiul Hasan, Kamil Umut Gke, Ahmed Bouferguene |
| 2008 | WSC | Simulation of modular building construction. | Osama M. Mohsen, Paul J. Knytl, Basel Abdulaal, Jacek Olearczyk, Mohamed Al-Hussein |
| 2007 | WSC | Process flowcharting and simulation of house structure components production process. | Haitao Yu, Mohamed Al-Hussein, Reza Nasseri |