Skip to content

Nidhal Rezg

Publication record assembled from the DBLP archive of ranked conferences.

Papers indexed

16

Venues

5

Active years

2001–2023

Best venue rank

A*

Where they publish

Papers

16 indexed papers, newest first.

YearVenueTitleAuthors
2023CoDITMulti-Periodic Pricing, Remanufacturing and Warranty Length Optimal Decisions within a Dual-Channel Supply Chain.Ahmed Farouk Hamzaoui, Sadok Turki, Nidhal Rezg
2018CoDITAn Optimal Integrated Maintenance to production with Carbon Emission for a Closed-loop System.Salim Bouslikhane, Zied Hajej, Nidhal Rezg
2014ETFAControl synthesis based on reachability graph with minimal cuts: Application to a flexible manufacturing system.Sadok Rezig, Zied Achour, Nidhal Rezg
2014ETFAInfinitesimal perturbation analysis for optimal production control in a reverse logistic system with different demands.Sadok Turki, Olivier Bistorin, Nidhal Rezg
2014SMCPerturbation analysis for discrete flow model: optimization of a manufacturing-remanufacturing system.Sadok Turki, Nidhal Rezg
2013ETFAOrder/remanufacturing policy of spare part with recovery option for stochastic deteriorating system.Hamza Boudhar, Mohammed Dahane, Nidhal Rezg
2013ETFAProduction planning in integrated maintenance context for multi-period multi-product failure-prone single-machine.Mohammed Haoues, Nadia Kinza Mouss, Mohammed Dahane, Nidhal Rezg
2013ETFAInfinitesimal perturbation analysis based optimization for a manufacturing-remanufacturing system.Sadok Turki, Olivier Bistorin, Nidhal Rezg
2013SMCA New Inspection Heuristic for a Condition-Based Maintenance Policy in a Spare Part Returns Context.Hamza Boudhar, Mohammed Dahane, Nidhal Rezg
2013SMCOptimization of Single-Manufacturer Multiple-Contractors Outsourcing Relationship in Integrated Approach of Production, Maintenance and Quality.Mohammed Haoues, Nadia Kinza Mouss, Mohammed Dahane, Nidhal Rezg
2012ETFAInfinitesimal perturbation analysis based optimization for a manufacturing system with delivery time.Sadok Turki, Olivier Bistorin, Nidhal Rezg
2009ETFATemporal Problem of Subcontracting of Manufacturing Unit under Joint Production Control and Maintenance Policy.Mohammed Dahane, Christian Clementz, Nidhal Rezg
2007ETFAImpact of the delay of subcontracting in a context of integrated maintenance: analytical approach.Mohammed Dahane, Christian Clementz, Nidhal Rezg
2006IRITime floating general mutual exclusion constraints in partial observable discrete event systems.Zied Achour, Nidhal Rezg
2002ICRAMaximally Permissive and Non-Blocking Control of Petri Nets using Theory of Regions.Asma Ghaffari, Nidhal Rezg, Xiaolan Xie
2001SMCAn integrated greedy heuristic for a flexible job shop scheduling problem.Yazid Mati, Nidhal Rezg, Xiaolan Xie