| 2018 | WSC | A supply Chain Model of hip STEM prostheses produced using 3D printing: a comprehensive Description of the simulation Model. | Margaret Golz, Richard A. Wysk, Russell E. King, Colin Nolan-Cherry, Stephen Bryant |
| 2016 | WSC | Supply Chain Operations Reference model for U.S. based powder bed metal additive manufacturing processes. | Surabhi Shouche, Richard A. Wysk, Russell E. King, Ola L. A. Harrysson |
| 2013 | WSC | Formal models for alternative representations of manufacturing systems of systems. | Seungyub Lee, Richard A. Wysk, Dongmin Shin |
| 2011 | HCI | Human Behavioral Simulation Using Affordance-Based Agent Model. | Namhun Kim, Jaekoo Joo, Ling Rothrock, Richard A. Wysk, Young-Jun Son |
| 2010 | WSC | An affordance-based formalism for modeling human-involvement in complex systems for prospective control. | Namhun Kim, Ling Rothrock, Jaekoo Joo, Richard A. Wysk |
| 2009 | WSC | Simulation for Predictive Control of a Distribution Center. | Lourdes A. Medina, R. Ufuk Bilsel, Richard A. Wysk, Vittaldas V. Prabhu, A. Ravi Ravindran |
| 2008 | WSC | A Pi-calculus formalism for discrete event simulation. | Jianrui Wang, Richard A. Wysk |
| 2004 | WSC | A Framework for Adaptive Synchronization of Distributed Simulations. | Bertan Altuntas, Richard A. Wysk |
| 2004 | WSC | A Resource Reconciliation Mechanism for a Manufacturing Federation Coordinated Using an MRP/ERP System. | Seungyub Lee, Richard A. Wysk |
| 2002 | WSC | General methodology 3: a federation object coordinator for simulation based control and analysis. | Seungyub Lee, Sreeram Ramakrishnan, Richard A. Wysk |
| 2002 | WSC | Real-time control: implementation of a simulation-based control architecture for supply chain interactions. | Sreeram Ramakrishnan, Seungyub Lee, Richard A. Wysk |
| 2001 | ICRA | An Operations Planner for Integrated Shop Floor Material Processing and Material Handling Operations. | Jay W. Steele, David J. Cannon, Richard A. Wysk |
| 2001 | SMC | An investigation of the influence of alternative process plans in a dynamic shop floor environment. | Junho Shin, Hyunbo Cho, Richard A. Wysk |
| 2001 | WSC | Computer-aided manufacturing simulation (CAMS) generation for interactive analysis: concepts, techniques, and issues. | Boonserm Kulvatunyou, Richard A. Wysk |
| 2001 | WSC | Process control and improvement: prediction of process parameters for intelligent control of freezing tunnels using simulation. | Sreeram Ramakrishnan, Richard A. Wysk, Vittaldas V. Prabhu |
| 2000 | WSC | Automatic generation of simulation models from neutral libraries: an example. | Young-Jun Son, Albert T. Jones, Richard A. Wysk |
| 1994 | WSC | Discrete event simulation for shop floor control. | Jeffrey S. Smith, Richard A. Wysk, David T. Sturrock, Sanjay E. Ramaswamy, Glen D. Smith, Sanjay B. Joshi |
| 1984 | WSC | Digital and physical simulation of manufacturing systems. | P. H. Cohen, Richard A. Wysk |
| 1984 | WSC | A simulation model for evaluating control algorithms of an automated storage/retrieval system. | Richard J. Linn, Richard A. Wysk |