Skip to content

Spyros A. Reveliotis

Publication record assembled from the DBLP archive of ranked conferences.

Papers indexed

18

Venues

4

Active years

1991–2023

Best venue rank

A*

Where they publish

Papers

18 indexed papers, newest first.

YearVenueTitleAuthors
2023ETFAA streamlined heuristic for the problem of Min-Time Coverage in Constricted Environments (Extended Abstract).Young-In Kim, Spyros A. Reveliotis
2019ETFAThroughput maximization of complex resource allocation systems through timed-continuous-Petri-net modeling (Extended Abstract).Michael Ibrahim, Spyros A. Reveliotis
2007ICRAGeneralized Algebraic Deadlock Avoidance Policies for Sequential Resource Allocation Systems.Spyros A. Reveliotis, Elzbieta Roszkowska, Jin Young Choi
2004ICRAModelling and Controlling Uncertainty in Optimal Disassembly Planning through Reinforcement Learning.Spyros A. Reveliotis
2003ICRAStructural analysis of resource allocation systems with synchronization constraints.Spyros A. Reveliotis
2002ICRAAn Analytical Investigation of the Scheduling Problem for Capacitated Re-Entrant Lines.Jin Young Choi, Spyros A. Reveliotis
2002ICRALiveness Enforcing Supervision for Resource Allocation Systems with Forbidden States and Uncontrollable Events.Jonghun Park, Spyros A. Reveliotis
2001ICRAAlgebraic Deadlock Avoidance Policies for Conjunctive / Disjunctive resource Allocation Systems.Jonghun Park, Spyros A. Reveliotis
2001ICRAA Colored Petri Net-based Approach to the Design of 300mm Wafer Fab Controllers.Jonghun Park, Spyros A. Reveliotis, Douglas A. Bodner, Chen Zhou, Leon F. McGinnis
2001SMCA high-fidelity, web-based simulator for 300 mm wafer fabs.Hansoo Kim, Jonghun Park, SugJe Sohn, Ying Wang, Spyros A. Reveliotis, Chen Zhou, Douglas A. Bodner, Leon F. McGinnis
2001SMCOn the optimality of randomized deadlock avoidance policies.Spyros A. Reveliotis, Jin Young Choi
2000ICRAEnhancing the Flexibility of Algebraic Deadlock Avoidance Policies through Petri Net Structural Analysis.Jonghun Park, Spyros A. Reveliotis
1999ICRAProduction Planning and Control in Flexibly Automated Manufacturing Systems: Current Status and Future Requirements.Spyros A. Reveliotis
1998ICRAAccommodating FMS Operational Contingencies through Routing Flexibility.Spyros A. Reveliotis
1998SMCVariations of Banker's algorithm for highly flexible resource allocation systems.Spyros A. Reveliotis
1997ICRAA polynomial-complexity tool for evaluating the performance of structurally controlled FMS.Spyros A. Reveliotis, Placid M. Ferreira
1996ICRADeadlock avoidance policies for flexible manufacturing systems: the conjunctive case.Spyros A. Reveliotis, Placid M. Ferreira
1991ICMLLearning to Select a Model in a Changing World.Mieczyslaw M. Kokar, Spyros A. Reveliotis