| 2000 | A Software Architecture for Timetable Construction. | Jeffrey H. Kingston, Benjamin Yin-Sun Lynn |
| 2000 | Modelling Timetabling Problems with STTL. | Jeffrey H. Kingston |
| 2000 | Solving Rostering Tasks as Constraint Optimization. | Harald Meyer auf'm Hofe |
| 2000 | Tabu Search Techniques for Examination Timetabling. | Luca Di Gaspero, Andrea Schaerf |
| 2000 | A Grouping Genetic Algorithm for Graph Colouring and Exam Timetabling. | Wilhelm Erben |
| 2000 | Some Complexity Aspects of Secondary School Timetabling Problems. | Huub M. M. ten Eikelder, R. J. Willemen |
| 2000 | A Hyperheuristic Approach to Scheduling a Sales Summit. | Peter I. Cowling, Graham Kendall, Eric Soubeiga |
| 2000 | Cyclical Staff Scheduling Using Constraint Logic Programming. | Peter Chan, Georges Weil |
| 2000 | A Comprehensive Course Timetabling and Student Scheduling System at the University of Waterloo. | Michael W. Carter |
| 2000 | A Multiobjective Genetic Algorithm for the Class/Teacher Timetabling Problem. | Marco P. Carrasco, Margarida Vaz Pato |
| 2000 | Three Methods to Automate the Space Allocation Process in UK Universities. | Edmund K. Burke, Peter I. Cowling, J. D. Landa Silva, Barry McCollum |
| 2000 | A Multicriteria Approach to Examination Timetabling. | Edmund K. Burke, Yuri Bykov, Sanja Petrovic |
| 2000 | Resource-Constrained Project Scheduling and Timetabling. | Peter Brucker, Sigrid Knust |
| 1997 | A List of Other Conference Presentations. | |
| 1997 | Generating Complete University Timetables by Combining Tabu Search with Constraint Logic. | George M. White, Junhan Zhang |
| 1997 | Construction of Basic Match Schedules for Sports Competitions by Using Graph Theory. | Arjen van Weert, Jan A. M. Schreuder |
| 1997 | Some Observations about GA-Based Exam Timetabling. | Peter Ross, Emma Hart, David Corne |
| 1997 | Improving a Lecture Timetabling System for University-Wide Use. | Ben Paechter, R. C. Rankin, Andrew Cumming |
| 1997 | A Brute Forte and Heuristics Approach to Tertiary Timetabling. | T. Nepal, S. W. Melville, M. I. Ally |
| 1997 | Experiments on Networks of Employee Timetabling Problems. | Amnon Meisels, Natalia Lusternik |
| 1997 | The Implementation of a Central Timetabling System in a Large British Civic University. | Barry McCollum |
| 1997 | Generalized Assignment-Type Problems: A Powerful Modeling Scheme. | Jacques A. Ferland |
| 1997 | A Comparison of Annealing Techniques for Academic Course Scheduling. | M. A. Saleh Elmohamed, Paul D. Coddington, Geoffrey C. Fox |
| 1997 | Off-the-Peg or Made-to-Measure? Timetabling and Scheduling with SA and TS. | Kathryn A. Dowsland |
| 1997 | A Constraint-Based Approach for Examination Timetabling Using Local Repair Techniques. | Philippe David |