Skip to content

International Conference on Operations Research and Enterprise Systems

ICORES

C

CORE rank

CORE rank (raw)

C

Fields of research

Artificial Intelligence

Papers indexed

889

2012–2026

Papers per year

201281 peak2026

ICORES papers

889 records sourced from DBLP. Search titles, filter by year, sort by recency.

YearTitleAuthors
2015Gasoline Shipper's Problem in Rail Transportation Contract in Thailand.Kannapha Amaruchkul
2015Newsvendor Model in Rail Contract to Transport Gasoline in Thailand.Kannapha Amaruchkul
2015An Optimization Model for Planning Operations in a Meat Packing Plant.Vctor M. Albornoz, Marcela Cecilia Gonzlez-Araya, Matas C. Gripe, Sara V. Rodrguez, E. Juventino Trevio
2015A Mixed Integer Linear Program for Operational Planning in a Meat Packing Plant.Vctor M. Albornoz, Marcela C. Gonzlez-Araya, Matas C. Gripe, Sara V. Rodrguez
2015Meeting Locations in Real-Time Ridesharing Problem: A Buckets Approach.Kamel Aissat, Ammar Oulamara
2015A Posteriori Approach of Real-time Ridesharing Problem with Intermediate Locations.Kamel Aissat, Ammar Oulamara
2015A Comparative Study of Network-based Approaches for Routing in Healthcare Wireless Body Area Networks.Pablo Adasme, Rafael Andrade, Janny Leung, Abdel Lisser
2014Learning Tabu Search for Combinatorial Optimization.Nicolas Zufferey, David Schindl
2014Optimization by Unconventional Ant Algorithms.Nicolas Zufferey
2014Simulated Annealing Algorithm for Job Shop Scheduling on Reliable Real-Time Systems.Daniil A. Zorin, Valery A. Kostenko
2014Job Shop Scheduling and Co-Design of Real-Time Systems with Simulated Annealing.Daniil A. Zorin, Valery A. Kostenko
2014The p-Median Problem with Concave Costs.Chuan Xu, Abdel Lisser, Janny Leung, Marc Letournel
2014Applications and Formulations of the Travelling Salesman Problem.Paul Williams
2014Elaboration of General Lower Bounds for the Total Completion Time in Flowshop Scheduling Problems through MaxPlus Approach.Nhat Vinh Vo, Pauline Fouillet, Christophe Lent
2014General Lower Bounds for the Total Completion Time in a Flowshop Scheduling Problem - MaxPlus Approach.Nhat Vinh Vo, Pauline Fouillet, Christophe Lent
2014A Fuzzy Model for Selecting Safeguards to Reduce Risks in Information Systems.Eloy Vicente, Alfonso Mateos, Antonio Jimnez-Martn
2014A Fuzzy Approach based on Dynamic Programming and Metaheuristics for Selecting Safeguards for Risk Management for Information Systems.Eloy Vicente, Alfonso Mateos, Antonio Jimnez-Martn
2014Robust Optimization.Jean-Philippe Vial
2014Optimal Fixed Interval Satellite Range Scheduling.Antonio J. Vzquez, Richard Scott Erwin
2014Motivations for the Development of a Multi-objective Algorithm Configurator.Nguyen Dang Thi Thanh, Patrick De Causmaecker
2014Integrated Supply Chain Network Design for Packaged Gases.Tejinder Pal Singh, Nicoleta Neagu, Michele Quattrone, Philippe Briet
2014A Relax and Fix Approach to Solve the Fixed Charge Network Design Problem with User-Optimal Flow.Pedro Henrique Gonzlez, Luidi Gelabert Simonetti, Carlos Alberto de Jesus Martinhon, Edcarllos Santos, Philippe Yves Paul Michelon
2014An Improved Relax-and-Fix Algorithm for the Fixed Charge Network Design Problem with User-optimal Flow.Pedro Henrique Gonzlez, Luidi Gelabert Simonetti, Carlos Alberto de Jesus Martinhon, Edcarllos Santos, Philippe Yves Paul Michelon
2014Four Serious Problems and New Facts of the Discriminant Analysis.Shuichi Shinmura
2014End of Discriminant Functions based on Variance-covariance Matrices.Shuichi Shinmura
676700 of 889← PreviousNext →

Comparable venues

Other A*/A conferences filed under the same field of research.