| 2011 | Delay Management including Capacities of Stations. | Twan Dollevoet, Marie Schmidt, Anita Schbel |
| 2011 | Faster Batched Shortest Paths in Road Networks. | Daniel Delling, Andrew V. Goldberg, Renato Fonseca F. Werneck |
| 2011 | A bilevel rescheduling framework for optimal inter-area train coordination. | Francesco Corman, Andrea D'Ariano, Dario Pacciarelli, Marco Pranzo |
| 2011 | The Lockmaster's problem. | Sofie Coene, Frits C. R. Spieksma |
| 2011 | On the Utilisation of Fuzzy Rule-Based Systems for Taxi Time Estimations at Airports. | Jun Chen, Stefan Ravizza, Jason A. D. Atkin, Paul J. Stewart |
| 2011 | Frontmatter, Table of Contents, Preface, Workshop Organization. | Alberto Caprara, Spyros C. Kontogiannis |
| 2011 | On the Smoothed Price of Anarchy of the Traffic Assignment Problem. | Luciana S. Buriol, Marcus Ritt, Flix Carvalho Rodrigues, Guido Schfer |
| 2011 | A Hypergraph Model for Railway Vehicle Rotation Planning. | Ralf Borndrfer, Markus Reuther, Thomas Schlechte, Steffen Weider |
| 2011 | Track Allocation in Freight-Train Classification with Mixed Tracks. | Markus Bohlin, Holger Flier, Jens Maue, Mats Mihalk |
| 2011 | Stochastic Delay Prediction in Large Train Networks. | Annabell Berger, Andreas Gebhardt, Matthias Mller-Hannemann, Martin Ostrowski |
| 2011 | Comparison of discrete and continuous models for the pooling problem. | Mohammed Alfaki, Dag Haugland |
| 2010 | The Complexity of Integrating Routing Decisions in Public Transportation Models. | Marie Schmidt, Anita Schbel |
| 2010 | Column Generation Heuristic for a Rich Arc Routing Problem. | Sbastien Lannez, Christian Artigues, Jean Damay, Michel Gendreau |
| 2010 | Traffic Signal Optimization Using Cyclically Expanded Networks. | Ekkehard Khler, Martin Strehler |
| 2010 | An Empirical Analysis of Robustness Concepts for Timetabling. | Marc Goerigk, Anita Schbel |
| 2010 | Engineering Time-Dependent Many-to-Many Shortest Paths Computation. | Robert Geisberger, Peter Sanders |
| 2010 | Fast Detour Computation for Ride Sharing. | Robert Geisberger, Dennis Luxen, Sabine Neubauer, Peter Sanders, Lars Vlker |
| 2010 | Vertex Disjoint Paths for Dispatching in Railways. | Holger Flier, Mats Mihalk, Anita Schbel, Peter Widmayer, Anna Zych |
| 2010 | Dynamic Graph Generation and Dynamic Rolling Horizon Techniques in Large Scale Train Timetabling. | Frank Fischer, Christoph Helmberg |
| 2010 | Frontmatter, Table of Contents, Preface, Organization. | Thomas Erlebach, Marco E. Lbbecke |
| 2010 | Heuristics for the Traveling Repairman Problem with Profits. | Thijs Dewilde, Dirk Cattrysse, Sofie Coene, Frits C. R. Spieksma, Pieter Vansteenwegen |
| 2010 | Robust Train Routing and Online Re-scheduling. | Alberto Caprara, Laura Galli, Leo G. Kroon, Gbor Marti, Paolo Toth |
| 2010 | Almost 20 Years of Combinatorial Optimization for Railway Planning: from Lagrangian Relaxation to Column Generation. | Alberto Caprara |
| 2010 | Railway Track Allocation by Rapid Branching. | Ralf Borndrfer, Thomas Schlechte, Steffen Weider |
| 2010 | The Team Orienteering Problem: Formulations and Branch-Cut and Price. | Marcus Poggi de Arago, Henrique Viana, Eduardo Uchoa |