Skip to content

Workshop on Algorithmic Approaches for Transportation Modelling, Optimization, and Systems

ATMOS

C

CORE rank

CORE rank (raw)

C

Fields of research

Theory of Computation · Applied Computing

Papers indexed

327

2004–2025

Papers per year

200419 peak2025

ATMOS papers

327 records sourced from DBLP. Search titles, filter by year, sort by recency.

YearTitleAuthors
2009An Improved Train Classification Procedure for the Hump Yard Lausanne Triage.Peter Mrton, Jens Maue, Marc Nunkesser
2009Scheduling Aircraft to Reduce Controller Workload.Joondong Kim, Alexander Kroeller, Joseph S. B. Mitchell
2009Delay Management with Re-Routing of Passengers.Twan Dollevoet, Dennis Huisman, Marie Schmidt, Anita Schbel
2009Efficient Route Planning in Flight Networks.Daniel Delling, Thomas Pajor, Dorothea Wagner, Christos D. Zaroliagis
2009ATMOS 2009 Preface -- 9th Workshop on Algorithmic Approaches for Transportation Modeling, Optimization, and Systems.Jens Clausen, Gabriele Di Stefano
2009Edges as Nodes - a New Approach to Timetable Information .Olaf Beyersdorff, Yevgen Nebesov
2009On Assessing Robustness in Transportation Planning.Apostolos Bessas, Christos D. Zaroliagis
2009Arc-Flags in Dynamic Graphs.Emanuele Berrettini, Gianlorenzo D'Angelo, Daniel Delling
2009Accelerating Time-Dependent Multi-Criteria Timetable Information is Harder Than Expected.Annabell Berger, Daniel Delling, Andreas Gebhardt, Matthias Mller-Hannemann
2009MILP formulations of cumulative constraints for railway scheduling - A comparative study.Martin Aronsson, Markus Bohlin, Per Kreuger
2008Line Planning on Paths and Tree Networks with Applications to the Quito Trolebs System.Luis Miguel Torres, Ramiro Torres, Ralf Borndrfer, Marc E. Pfetsch
2008IP-based Techniques for Delay Management with Priority Decisions.Michael Schachtebeck, Anita Schbel
2008Solving Periodic Timetable Optimisation Problems by Modulo Simplex Calculations.Karl Nachtigall, Jens Opitz
2008Simultaneous Network Line Planning and Traffic Assignment.Karl Nachtigall, Karl Jerosch
2008The Second Chvatal Closure Can Yield Better Railway Timetables.Christian Liebchen, Elmar Swarat
2008Robust Line Planning under Unknown Incentives and Elasticity of Frequencies.Spyros C. Kontogiannis, Christos D. Zaroliagis
2008Efficient On-Trip Timetable Information in the Presence of Delays.Lennart Frede, Matthias Mller-Hannemann, Mathias Schnee
2008ATMOS 2008 Abstracts Collection - 8th Workshop on Algorithmic Approaches for Transportation Modeling, Optimization, and Systems.Matteo Fischetti, Peter Widmayer
2008ATMOS 2008 Preface -- 8th Workshop on Algorithmic Approaches for Transportation Modeling, Optimization, and Systems.Matteo Fischetti, Peter Widmayer
2008Towards Solving Very Large Scale Train Timetabling Problems by Lagrangian Relaxation.Frank Fischer, Christoph Helmberg, Jrgen Janen, Boris Krostitz
2008Integrated Gate and Bus Assignment at Amsterdam Airport Schiphol.Guido Diepen, Marjan van den Akker, Han Hoogeveen
2008Engineering Time-Expanded Graphs for Faster Timetable Information.Daniel Delling, Thomas Pajor, Dorothea Wagner
2008Dynamic Algorithms for Recoverable Robustness Problems.Serafino Cicerone, Gabriele Di Stefano, Michael Schachtebeck, Anita Schbel
2008Recoverable Robustness for Railway Rolling Stock Planning.Valentina Cacchiani, Alberto Caprara, Laura Galli, Leo G. Kroon, Gbor Marti
2007Branching Strategies to Improve Regularity of Crew Schedules in Ex-Urban Public Transit.Ingmar Steinzen, Leena Suhl, Natalia Kliewer
251275 of 327← PreviousNext →

Comparable venues

Other A*/A conferences filed under the same field of research.