| 2009 | An Improved Train Classification Procedure for the Hump Yard Lausanne Triage. | Peter Mrton, Jens Maue, Marc Nunkesser |
| 2009 | Scheduling Aircraft to Reduce Controller Workload. | Joondong Kim, Alexander Kroeller, Joseph S. B. Mitchell |
| 2009 | Delay Management with Re-Routing of Passengers. | Twan Dollevoet, Dennis Huisman, Marie Schmidt, Anita Schbel |
| 2009 | Efficient Route Planning in Flight Networks. | Daniel Delling, Thomas Pajor, Dorothea Wagner, Christos D. Zaroliagis |
| 2009 | ATMOS 2009 Preface -- 9th Workshop on Algorithmic Approaches for Transportation Modeling, Optimization, and Systems. | Jens Clausen, Gabriele Di Stefano |
| 2009 | Edges as Nodes - a New Approach to Timetable Information . | Olaf Beyersdorff, Yevgen Nebesov |
| 2009 | On Assessing Robustness in Transportation Planning. | Apostolos Bessas, Christos D. Zaroliagis |
| 2009 | Arc-Flags in Dynamic Graphs. | Emanuele Berrettini, Gianlorenzo D'Angelo, Daniel Delling |
| 2009 | Accelerating Time-Dependent Multi-Criteria Timetable Information is Harder Than Expected. | Annabell Berger, Daniel Delling, Andreas Gebhardt, Matthias Mller-Hannemann |
| 2009 | MILP formulations of cumulative constraints for railway scheduling - A comparative study. | Martin Aronsson, Markus Bohlin, Per Kreuger |
| 2008 | Line Planning on Paths and Tree Networks with Applications to the Quito Trolebs System. | Luis Miguel Torres, Ramiro Torres, Ralf Borndrfer, Marc E. Pfetsch |
| 2008 | IP-based Techniques for Delay Management with Priority Decisions. | Michael Schachtebeck, Anita Schbel |
| 2008 | Solving Periodic Timetable Optimisation Problems by Modulo Simplex Calculations. | Karl Nachtigall, Jens Opitz |
| 2008 | Simultaneous Network Line Planning and Traffic Assignment. | Karl Nachtigall, Karl Jerosch |
| 2008 | The Second Chvatal Closure Can Yield Better Railway Timetables. | Christian Liebchen, Elmar Swarat |
| 2008 | Robust Line Planning under Unknown Incentives and Elasticity of Frequencies. | Spyros C. Kontogiannis, Christos D. Zaroliagis |
| 2008 | Efficient On-Trip Timetable Information in the Presence of Delays. | Lennart Frede, Matthias Mller-Hannemann, Mathias Schnee |
| 2008 | ATMOS 2008 Abstracts Collection - 8th Workshop on Algorithmic Approaches for Transportation Modeling, Optimization, and Systems. | Matteo Fischetti, Peter Widmayer |
| 2008 | ATMOS 2008 Preface -- 8th Workshop on Algorithmic Approaches for Transportation Modeling, Optimization, and Systems. | Matteo Fischetti, Peter Widmayer |
| 2008 | Towards Solving Very Large Scale Train Timetabling Problems by Lagrangian Relaxation. | Frank Fischer, Christoph Helmberg, Jrgen Janen, Boris Krostitz |
| 2008 | Integrated Gate and Bus Assignment at Amsterdam Airport Schiphol. | Guido Diepen, Marjan van den Akker, Han Hoogeveen |
| 2008 | Engineering Time-Expanded Graphs for Faster Timetable Information. | Daniel Delling, Thomas Pajor, Dorothea Wagner |
| 2008 | Dynamic Algorithms for Recoverable Robustness Problems. | Serafino Cicerone, Gabriele Di Stefano, Michael Schachtebeck, Anita Schbel |
| 2008 | Recoverable Robustness for Railway Rolling Stock Planning. | Valentina Cacchiani, Alberto Caprara, Laura Galli, Leo G. Kroon, Gbor Marti |
| 2007 | Branching Strategies to Improve Regularity of Crew Schedules in Ex-Urban Public Transit. | Ingmar Steinzen, Leena Suhl, Natalia Kliewer |